ProZ.com global directory of translation services
 The translation workplace
Ideas
KudoZ home » English » Tech/Engineering

IT involvement

English translation: Computer Storage System


Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs
(or are passionate about them). Participation is free and the site has a strict confidentiality policy.
GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
English term or phrase:IT involvement
English translation:Computer Storage System
Entered by: Iftekhar Hassan
Options:
- Contribute to this entry
- Include in personal glossary

19:33 Oct 6, 2003
English to English translations [PRO]
Tech/Engineering
English term or phrase: IT involvement
I apologize for asking so many questions...

Title: Selling Solutions that Include Storage

Selling solutions and the ROI (or “Return on Investment”). If you can phase in a customer’s requirement over time by adding storage or more servers over a period of time, customers will be more satisfied. It will reduce the impact to their environment. Reducing IT administration, fully automating the application backups for a lights out operation, ***which means no IT involvement with taped library integration***. That would be great, customers love that.

involvement of IT staff?
if you understand the meaning of the part between ***, could you expand or rephrase it in a clearer way?

thanks!
Elena Ghetti
Italy
Local time: 12:26
involvement of overall IT based resourses
Explanation:
Involvment of overall IT based resourses, does not specify "IT staff" however there is specific reference to taped library for integration.

Please look at the following:-


http://www.dalet.com/General/00000219.pdf
http://www.dalet.com/General/00000219.pdf
www.dalet.com/General/00000219.pdf -


--------------------------------------------------
Note added at 4 days (2003-10-10 21:44:56 GMT) Post-grading
--------------------------------------------------

Read Resources, not resources
Selected response from:

Iftekhar Hassan
Local time: 06:26
Grading comment
thanks a lot everybody!
4 KudoZ points were awarded for this answer



Summary of answers provided
3 +3which means the IT staff won't have to do tape backups
Peter Linton
5 +1Information Technology involvement
Michael Powers (PhD)
5Application level backups and involvement of IT stuff
walzl
5The IT staff will not be burdened by manual ...
Alaa Zeineldine
4involvement of overall IT based resoursesIftekhar Hassan
4involvement of IT (information technology ) staff
Hector Calabia


  

Answers


1 min   confidence: Answerer confidence 5/5 peer agreement (net): +1
it involvement
Information Technology involvement


Explanation:
Oxford

IT n [u] = information technology



Michael Powers (PhD)
United States
Local time: 06:26
Native speaker of: Native in EnglishEnglish
PRO pts in pair: 1174

Peer comments on this answer (and responses from the answerer)
agree  langclinic
12 hrs
Login to enter a peer comment (or grade)

3 mins   confidence: Answerer confidence 5/5
it involvement
The IT staff will not be burdened by manual ...


Explanation:
hadnling of tape backups.

Alaa Zeineldine
Egypt
Local time: 13:26
Native speaker of: Native in ArabicArabic, Native in EnglishEnglish
PRO pts in pair: 198
Login to enter a peer comment (or grade)

5 mins   confidence: Answerer confidence 4/5Answerer confidence 4/5
involvement of IT (information technology ) staff


Explanation:
You are right. This means no involvement of IT (data center) staff is necessary for this function.

Hector Calabia
Local time: 12:26
Native speaker of: Native in SpanishSpanish
Login to enter a peer comment (or grade)

1 hr   confidence: Answerer confidence 3/5Answerer confidence 3/5 peer agreement (net): +3
which means the IT staff won't have to do tape backups


Explanation:
The solution that they are selling includes the backing up of data in a lights-out operation - in other words, automatic, probably at night, and therefore not involving the IT staff in this process.
In many large computer operations, it is still quite common to have manual tape backups, in a tape library (not taped library!). The typical pattern is to have three sets of tapes, called "grandfather, father and son". Each day record on one set of tapes in sequence, so you always have two days to fall back on. But this is a labour-intensive process, so a system that eliminates that manual job give is a good ROI and is therefore loved by customers (and the IT staff).


Peter Linton
Local time: 11:26
Native speaker of: Native in EnglishEnglish
PRO pts in pair: 139

Peer comments on this answer (and responses from the answerer)
agree  vixen
10 hrs

agree  langclinic
11 hrs

agree  ghassan al-Alem
21 hrs
Login to enter a peer comment (or grade)

22 hrs   confidence: Answerer confidence 5/5
it involvement
Application level backups and involvement of IT stuff


Explanation:
Backups are normally done during off hours. This means that all databases would be shut down, backup would be performed automatically, driven by software that allows scheduling these operations and running the tape libraries. Tapes in the libraries and monitoring of this software requires administration of IT stuff. This means that daily work is backed up at the end of the day - so if there is any power outage during the day - that day work is lost.
Application level backup is backup that is performed while databases are open and running. These files can then be transfered to a separate server that will allow in power outage situations or any other failing of exisiting server to "step in" and everyone would continue their work. These transfers happen automatically through network connections. This kind of backup is also called "hot backup".
These operations still require IT stuff, but they are less involved if there is a server failure of any kind. Sometimes power outages can damage server to the extend that it will be down for repairs for couple of days. With the other server running, IT stuff doesn't have to work overtime to fix it as fast as possible.

--------------------------------------------------
Note added at 22 hrs 52 mins (2003-10-07 18:25:39 GMT)
--------------------------------------------------

and here are some links if you\'d like to read about it...

http://pigseye.kennesaw.edu/~jkirui/BkupReco.html

walzl
PRO pts in pair: 4
Login to enter a peer comment (or grade)

21 mins   confidence: Answerer confidence 4/5Answerer confidence 4/5
it involvement
involvement of overall IT based resourses


Explanation:
Involvment of overall IT based resourses, does not specify "IT staff" however there is specific reference to taped library for integration.

Please look at the following:-


http://www.dalet.com/General/00000219.pdf
http://www.dalet.com/General/00000219.pdf
www.dalet.com/General/00000219.pdf -


--------------------------------------------------
Note added at 4 days (2003-10-10 21:44:56 GMT) Post-grading
--------------------------------------------------

Read Resources, not resources


    www.dalet.com/General/00000219.pdf -
Iftekhar Hassan
Local time: 06:26
Native speaker of: Native in BengaliBengali, Native in UrduUrdu
PRO pts in pair: 42
Grading comment
thanks a lot everybody!

Peer comments on this answer (and responses from the answerer)
neutral  Peter Linton: Resources, not resourses
4 days
  -> Thanks, corrected typo
Login to enter a peer comment (or grade)