bouwstroompaddestoel

English translation: construction power pedestal

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
Dutch term or phrase:bouwstroompaddestoel
English translation:construction power pedestal
Entered by: Petra Molenaar

17:07 Feb 19, 2007
Dutch to English translations [PRO]
Tech/Engineering - Construction / Civil Engineering / gas
Dutch term or phrase: bouwstroompaddestoel
no context alas
Petra Molenaar
construction power pedestal
Explanation:
Residential Developments: The building permit initiates installation of construction power. After the building permit is issued, the power pedestal is set at the point of the electric service stub near the corner of the lot. The cost of the construction power pedestal is normally included with other charges on the building permit. In some cases, it is necessary to construct a temporary system to make power available.
Residential Developments: The building permit initiates installation of construction power. After the building permit is issued, the power pedestal is set at the point of the electric service stub near the corner of the lot. The cost of the construction power pedestal is normally included with other charges on the building permit. In some cases, it is necessary to construct a temporary system to make power available
http://fcgov.com/electric/devfaq.php
Selected response from:

Kate Hudson (X)
Netherlands
Local time: 13:39
Grading comment
4 KudoZ points were awarded for this answer



Summary of answers provided
4 +3construction power pedestal
Kate Hudson (X)


Discussion entries: 1





  

Answers


55 mins   confidence: Answerer confidence 4/5Answerer confidence 4/5 peer agreement (net): +3
construction power pedestal


Explanation:
Residential Developments: The building permit initiates installation of construction power. After the building permit is issued, the power pedestal is set at the point of the electric service stub near the corner of the lot. The cost of the construction power pedestal is normally included with other charges on the building permit. In some cases, it is necessary to construct a temporary system to make power available.
Residential Developments: The building permit initiates installation of construction power. After the building permit is issued, the power pedestal is set at the point of the electric service stub near the corner of the lot. The cost of the construction power pedestal is normally included with other charges on the building permit. In some cases, it is necessary to construct a temporary system to make power available
http://fcgov.com/electric/devfaq.php

Kate Hudson (X)
Netherlands
Local time: 13:39
Works in field
Native speaker of: English
PRO pts in category: 222

Peer comments on this answer (and responses from the answerer)
agree  Saskia Steur (X)
1 hr
  -> Thanks,

agree  Jack den Haan
1 hr
  -> Thanks

agree  CJG (X)
3 hrs
  -> Thanks
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search