inspanningsinschatting

English translation: effort estimate

Advertisement

Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs
(or are passionate about them). Participation is free and the site has a strict confidentiality policy.
GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
Dutch term or phrase:inspanningsinschatting
English translation:effort estimate
Entered by: Ashok Bagri
Options:
- Contribute to this entry
- Include in personal glossary

09:53 Mar 5, 2004
Dutch to English translations [Non-PRO]
Tech/Engineering - IT (Information Technology) / ERP
Dutch term or phrase: inspanningsinschatting
1.4 Referentie documenten (uitgangsdocumentatie)

Tabel Referentie
Would efforts estimate be appropriate.

Naam Auteur Nummer/Versie
Besluitvormingsdocument Afschermen van bevoegdheden en ontsluiten van informatie in AP Herman van Loon Oplossingsvoorstel en inspanningsinschatting
Functioneel Ontwerp BZ Workflow goedkeuren en betalen AP Technisch Ontwerp BZ Workflow goedkeuren en betalen AP
Ashok Bagri
India
Local time: 23:58
Effort estimate
Explanation:
Perhaps, "effort estimate", but I'm not too sure about it!

e.g.

# Use the known development effort from the selected project, (analogue), as an initial estimate for the target project
# Compare each of the chosen attributes, (size, platform etc.,).
# Establish or adjust the initial effort estimate in light of the differences between the analogue and your planned project.

ref. http://www.isbsg.org.au/html/estech.html

--------------------------------------------------
Note added at 2004-03-05 10:00:31 (GMT)
--------------------------------------------------

III.16.1 Develop cost/effort estimate for the enhancement.

Intent: The intent of this task is to develop an estimate of project effort for the enhancement.

ref. http://www.rspa.com/apm/Task-III-16.html

--------------------------------------------------
Note added at 2004-03-05 10:01:20 (GMT)
--------------------------------------------------

Now that we have estimated the effort of our project, we can determine the schedule. Unless you have a better method, you can use the following rule-of-thumb (McConnell 183) to translate your effort estimate into a schedule estimate:

schedule in months = 3.0 x effort-months


e.g. http://www.gr.com/new/estimating.asp

--------------------------------------------------
Note added at 2004-03-05 10:01:46 (GMT)
--------------------------------------------------

In fact there are quite a few references for \"effort estimate\"!
Selected response from:

Adam Smith
United Kingdom
Local time: 19:28
Grading comment
Thanks.
4 KudoZ points were awarded for this answer

Advertisement


Summary of answers provided
3 +3Effort estimate
Adam Smith


  

Answers


5 mins   confidence: Answerer confidence 3/5Answerer confidence 3/5 peer agreement (net): +3
Effort estimate


Explanation:
Perhaps, "effort estimate", but I'm not too sure about it!

e.g.

# Use the known development effort from the selected project, (analogue), as an initial estimate for the target project
# Compare each of the chosen attributes, (size, platform etc.,).
# Establish or adjust the initial effort estimate in light of the differences between the analogue and your planned project.

ref. http://www.isbsg.org.au/html/estech.html

--------------------------------------------------
Note added at 2004-03-05 10:00:31 (GMT)
--------------------------------------------------

III.16.1 Develop cost/effort estimate for the enhancement.

Intent: The intent of this task is to develop an estimate of project effort for the enhancement.

ref. http://www.rspa.com/apm/Task-III-16.html

--------------------------------------------------
Note added at 2004-03-05 10:01:20 (GMT)
--------------------------------------------------

Now that we have estimated the effort of our project, we can determine the schedule. Unless you have a better method, you can use the following rule-of-thumb (McConnell 183) to translate your effort estimate into a schedule estimate:

schedule in months = 3.0 x effort-months


e.g. http://www.gr.com/new/estimating.asp

--------------------------------------------------
Note added at 2004-03-05 10:01:46 (GMT)
--------------------------------------------------

In fact there are quite a few references for \"effort estimate\"!

Adam Smith
United Kingdom
Local time: 19:28
Works in field
Native speaker of: Native in EnglishEnglish
PRO pts in category: 20
Grading comment
Thanks.

Peer comments on this answer (and responses from the answerer)
agree  Saskia Steur
43 mins
  -> Thank you

agree  Mirjam Bonne-Nollen
8 hrs
  -> Thanks

agree  Ramon Somoza
11 hrs
Login to enter a peer comment (or grade)




Return to KudoZ list


KudoZ™ translation help
The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.



See also:



Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search