ProZ.com global directory of translation services
 The translation workplace
Ideas
KudoZ home » English to Arabic » Construction / Civil Engineering

on critical path

Arabic translation: بجداول زمنية مضغوطة


Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs
(or are passionate about them). Participation is free and the site has a strict confidentiality policy.
GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
English term or phrase:on critical path
Arabic translation: بجداول زمنية مضغوطة
Entered by: Ali Al awadi
Options:
- Contribute to this entry
- Include in personal glossary

08:06 May 2, 2007
English to Arabic translations [PRO]
Bus/Financial - Construction / Civil Engineering / Information Tecnology
English term or phrase: on critical path
By other words, managers always accelerate the project by applying over time to the activities on critical paths without considering the level of skills in a crew.
Awadh Balaish
Local time: 07:04
الأنشطة ذات الجداول الزمنية المضغوطة
Explanation:
أو
الأنشطة ذات الجدول الزمني الضيق
جدول زمني محدود/مقيد

كلها تصلح في رأيي

إننا نحاول الانتهاء من الوحدة السكنية خلال ستة أشهر من بدء العمل، حيث يتم تخصيص ميزانية تبلغ 27 ألف دينار لكل منزل، وهذا يعني أننا نعمل من خلال جدول زمني مضغوط حيث يتوجب علينا التنسيق مع الوزارات المعنية بتوفير المرافق المختلفة ومواجهة المشاكل التي تواجههم أحياناً ."
Selected response from:

Ali Al awadi
Romania
Local time: 07:04
Grading comment
Thank you Ali Alawadi
4 KudoZ points were awarded for this answer



Summary of answers provided
3 +3الأنشطة ذات الجداول الزمنية المضغوطةAli Al awadi
5 +1أسلوب المسار الحرج (CPM)
Hani Hassaan
4 +1على المسار الحرج
hanysalah


  

Answers


16 mins   confidence: Answerer confidence 3/5Answerer confidence 3/5 peer agreement (net): +3
الأنشطة ذات الجداول الزمنية المضغوطة


Explanation:
أو
الأنشطة ذات الجدول الزمني الضيق
جدول زمني محدود/مقيد

كلها تصلح في رأيي

إننا نحاول الانتهاء من الوحدة السكنية خلال ستة أشهر من بدء العمل، حيث يتم تخصيص ميزانية تبلغ 27 ألف دينار لكل منزل، وهذا يعني أننا نعمل من خلال جدول زمني مضغوط حيث يتوجب علينا التنسيق مع الوزارات المعنية بتوفير المرافق المختلفة ومواجهة المشاكل التي تواجههم أحياناً ."



    Reference: http://www.mwh.gov.bh/narticle.php?id=757
Ali Al awadi
Romania
Local time: 07:04
Native speaker of: Arabic
PRO pts in category: 20
Grading comment
Thank you Ali Alawadi

Peer comments on this answer (and responses from the answerer)
agree  Ahmad Batiran
45 mins
  -> Thanks Arabic Tongue

agree  siba chehab
1 hr
  -> Thanks youth

agree  NativeArabic
2 hrs
  -> Thanks Abdulrahman
Login to enter a peer comment (or grade)

25 mins   confidence: Answerer confidence 4/5Answerer confidence 4/5 peer agreement (net): +1
على المسار الحرج


Explanation:
يستخدم التعبير في علم الادارة

hanysalah
Egypt
Local time: 06:04
Specializes in field
Native speaker of: Native in ArabicArabic
PRO pts in category: 44

Peer comments on this answer (and responses from the answerer)
agree  Ahmad Batiran
37 mins
  -> شكرا جزيلا
Login to enter a peer comment (or grade)

41 mins   confidence: Answerer confidence 5/5 peer agreement (net): +1
أسلوب المسار الحرج (CPM)


Explanation:
يتم تطبيق خطوات أسلوب المسار الحرج لتحديد أقل زمن لأداء مشروع معين.
وإليك المثال التالي للتوصيح:
-استخدام أسلوب المسار الحرج cpm في تخطيط والمتابعة تنفيذ المشاريع الإنشائية /دراسة تطبيقية للمشروع مطار اربيل.


    Reference: http://216.239.59.104/search?q=cache:ydrCOFnpF8cJ:www.usalah...
    Reference: http://www.mdcegypt.com/Site-Arabic/Management%20Approaches-...
Hani Hassaan
Egypt
Local time: 06:04
Works in field
Native speaker of: Native in EnglishEnglish, Native in ArabicArabic
PRO pts in category: 39
1 corroborated select project
in this pair and field What is ProZ.com Project History(SM)?

Peer comments on this answer (and responses from the answerer)
agree  xxxhanan hussei
9 hrs
  -> thanks very much, Hanan.
Login to enter a peer comment (or grade)




Return to KudoZ list


Changes made by editors
May 5, 2007 - Changes made by Ali Al awadi:
Created KOG entryKudoZ term => KOG term


KudoZ™ translation help
The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.



See also: