ProZ.com global directory of translation services
 The translation workplace
Ideas
KudoZ home » English to Arabic » Construction / Civil Engineering

P schedules

Arabic translation: الجداول الزمنية للمشروع


Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs
(or are passionate about them). Participation is free and the site has a strict confidentiality policy.
GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
English term or phrase:P schedules
Arabic translation:الجداول الزمنية للمشروع
Entered by: Ahmed Samir
Options:
- Contribute to this entry
- Include in personal glossary

08:07 Mar 31, 2010
English to Arabic translations [PRO]
Construction / Civil Engineering
English term or phrase: P schedules
Context:
Distribution Graph
By using Primavera Risk Analysis distribution graphs (see Figure 2), users can
· Determine confidence levels, P schedules, and schedule and cost contingency
· Report confidence levels with regard to finish dates, costs, float, internal rate of return, and net present value
· Drill down through the interactive report to identify confidence levels at multiple levels, including key milestones and stage-gate review points
Ahmed Samir
Local time: 06:08
الجداول الزمنية للمشروع
Explanation:
KEY BENEFITS
• Integrate directly with project
schedules and costs
• Provide a comprehensive
means of reporting project
confidence levels
• Produce risk analysis reports
in a variety of formats
• Provide techniques for
determining contingency and
risk response plans
http://www.oracle.com/ocom/groups/public/@ocompublic/documen...

--------------------------------------------------
Note added at 3 hrs (2010-03-31 11:11:45 GMT)
--------------------------------------------------

It stands for "Project".
Selected response from:

Nadia Ayoub
Egypt
Local time: 06:08
Grading comment
many thanks
4 KudoZ points were awarded for this answer



Summary of answers provided
4الجداول الزمنية للمشروع
Nadia Ayoub
2جداول البرامج / جداول الأولويات
hassan zekry


  

Answers


7 mins   confidence: Answerer confidence 2/5Answerer confidence 2/5
p schedules
جداول البرامج / جداول الأولويات


Explanation:
P might stand for: programs, priority.

hassan zekry
Local time: 06:08
Works in field
Native speaker of: Native in ArabicArabic
PRO pts in category: 80
Login to enter a peer comment (or grade)

3 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5
p schedules
الجداول الزمنية للمشروع


Explanation:
KEY BENEFITS
• Integrate directly with project
schedules and costs
• Provide a comprehensive
means of reporting project
confidence levels
• Produce risk analysis reports
in a variety of formats
• Provide techniques for
determining contingency and
risk response plans
http://www.oracle.com/ocom/groups/public/@ocompublic/documen...

--------------------------------------------------
Note added at 3 hrs (2010-03-31 11:11:45 GMT)
--------------------------------------------------

It stands for "Project".

Nadia Ayoub
Egypt
Local time: 06:08
Native speaker of: Native in ArabicArabic
PRO pts in category: 158
Grading comment
many thanks
Login to enter a peer comment (or grade)




Return to KudoZ list


KudoZ™ translation help
The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.



See also: