@ Sybille 12:26 Aug 24, 2011
Um den Sachverhalt hinzurücken: crane parts betrifft bestimmt die Kranausrüstung im Hafen (z.B. keine ausreichende Tragkraft). Geladen wird die Yacht!
Der Rest betrifft sicher die Geltungsdauer des Leasing-/Mietvertrags. S. auch im grand dictionnaire terminologique diese Def. für off-hire day:
"In a time charter, the owner is entitled to a limited time for his vessel to be off hire until such time as she may be repaired or drydocked. The permissible time is prearranged by the contracting parties. Normally 24/28 hours are allowed, after which time the hire money ceases until the vessel is seaworthy again in all respects. " |