This question was closed without grading. Reason: No acceptable answer

English to Russian translations [PRO]
Tech/Engineering - Engineering (general)
English term or phrase: production FFS vs workmanship
Речь идёт о достоинствах автоматизированного УЗ контроля (и недостатках радиологоческого контроля).

In practice, CC 2235 proved:
- More amenable to construction needs, i.e. there was less disruption to production.
- Ensured production FFS (ECA), rather than workmanship.
- Compatible with post-construction or in-service for nuclear UT
- Produced significant cost savings (mainly due to no lost production).

Вот второй пункт здесь мне непонятен вообще. Есть предположение, что FFS - это for future study, но картину это для меня не проясняет.

Пояснения:
1. CC 2235 - это часто стандарта ASME, описывающая преимущества АУЗК перед РДК.
2. ECA - Engineering critical assessment (инженерная оценка критичности дефекта)

Для полиглотов испанский вариант:
Asegura la produccion FFS (ECA), en vez de la fabricacion
Поскольку оригинал всё-таки английский, то переводчик тут мог и ошибаться.


Спасибо
yanadeni
Canada
Local time: 16:35
Advertisement

Summary of reference entries provided
Aleksey Chervinskiy
svetlana cosquéric

Discussion entries: 4





  

Reference comments


36 mins peer agreement (net): +1
Reference

Reference information:
Есть предположение, что это workmanship levels or workmanship standards.

Т.е. FFS и ECA это тоже своего рода стандарты, более требовательные чем стандарты workmanship, позволяющие обеспечить более высокое качество

""Welding methods and quality are the dominant issues of high-strength steel construction
because of the effects on overall system reliability, as well as its cost impact to the
project. New mechanized welding procedures are routinely investigated, including dual
and quad tandem systems; however, the weld control must be carefully designed and
matched to the strength requirements. Regarding the interaction of welding with a Limit
State Design approach, it is noted that the strain capacities required may not be reached at
industry workmanship levels in CFR, so additional and more stringent requirements for
flaw detection are imposed. This workmanship standard may cause a higher than usual
and unwarranted weld reject/repair rates; therefore, the repair procedure and
documentation of alternative acceptance methodologies would be carefully considered.
More generally, the use of high-strength steels, pipe, weld and HAZ toughness,
mechanized welding, and UT inspection virtually necessitates performance of
engineering critical assessments (ECA), as identified in Appendix K of CSA Z662, to
determine an alternative defect acceptability."

http://www.bakerprojects.com/phmsa/pdf/Pipeline Consensus St...

Aleksey Chervinskiy
United States
Native speaker of: Russian

Peer comments on this reference comment (and responses from the reference poster)
agree  svetlana cosquéric
3 hrs
Login to enter a peer comment (or grade)

3 hrs
Reference

Reference information:
Pipelines are now using Fitness-For-Service (FFS) for accept/reject of weld defects. FFS requires accurate measurement of defect height for Fracture Mechanics assessments.

--------------------------------------------------
Note added at 3 hrs (2008-09-06 19:58:27 GMT)
--------------------------------------------------

Purpose of Fitness-For-Service
When your equipment is first constructed, it is based on theoretical calculations or standard codes. After the equipment has been put in service for some time, its condition deteriorates. At this point of time, you have to decide if replacement or repair is to be done, or
can the equipment be used for the remaining design life without compromising the safety of the operators and staff.

In circumstances where it is necessary to examine critically the integrity of new or existing constructions, we at DNV with the principles of FFS (Fitness-For-Services) and ECA (Engineering Critical Assessment) in accordance to API 579 and BS 7910 coupled with advance NDT (Non-Destructive Testing) techniques provides this assessment service.

What are FFS and ECA?
Often it is found upon inspection and assessment that the code requirements can no longer be met. The decision whether to continue operation or shut down for repair and modification may have great economic consequences for the plant. FFS assessment is a multi-disciplinary engineering analysis of equipment to determine if it is safe and fit for continued service until the end of some desired period of operation (for example, until the next shutdown, until some specific future date, or until the end of its useful life). FFS is mainly performed on in-service equipment as per API 579 and BS 7910.

ECA is applied during the design and implementation phase. As fabrication is never perfect and flaws will always exist in some form. ECA form a basis for alternative acceptance standards for production weld as per BS 7910. The advantage is to reduce the repair rate, save time and cost for the project.

http://www.widepin.com/aims/ffs.html

--------------------------------------------------
Note added at 3 hrs (2008-09-06 20:12:38 GMT)
--------------------------------------------------

вот тут посмотрите тоже: http://www.emt.ru/news.php?id=180

... Связь с Mat/PRO и FFS для второго и третьего уровня расчетов по пригодности к эксплуатации для моделей...


    www.olympusndt.com/ndt-application/183-id.209715220.html - 74k
svetlana cosquéric
France
Specializes in field
Native speaker of: Native in RussianRussian
PRO pts in category: 91
Login to enter a peer comment (or grade)




Return to KudoZ list


KudoZ™ translation help
The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.



See also:



Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search