4 +1 | Installation trial/test |
| ||
5 | trial assemblies or trial installation |
| ||
5 | trial erection |
| ||
4 | Trial assemblies |
| ||
4 | assembly tests or testing |
|
Trial assemblies Explanation: Is correct. |
| |
Login to enter a peer comment (or grade) |
Installation trial/test Explanation: Or Trial assembly...it depends on what the unit is.. cables...power box.. converter etc. |
| |
Login to enter a peer comment (or grade) |
trial assemblies or trial installation Explanation: For "essais de routine" I prefer simply "routine testing" "et autres essais" = "and other tests". Normally, it is stated in such specifications if these tests are in the supplier's factory or if on the site, these are "field tests". |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
assembly tests or testing Explanation: PDF]note note File Format: PDF/Adobe Acrobat - View as HTML Your browser may not have a PDF reader available. Google recommends visiting our text version of this document. ... The assembly test is performed when the boards and some of the mechanical components are all connected together and the phone is checked for assembly faults ... www.ifrsys.com/products/generators/appnotes/881.pdf - Similar pages ECT TAKES AIM AT ADVANCED BACKPLANEL APPLICATIONS WITH THE ZEUS ... ... in-circuit test. Once in place, backpanels are almost impossible to rework, so thorough assembly test is essential. To create an ... www.ectinfo.com/files/resource/press/12_98/zeus.htm - 7k - Cached - Similar pages Article in IAEA-TECDOC--901: Acceptance test for graphite ... ... The assembly test is performed at the works, prior to their installation in the reactor pressure vessel, to examine fabricating precision of each component and ... www.iaea.or.at/inis/aws/htgr/ abstracts/abst_28008818.html - Trial Assembly: parts alignment checked with measuring machine (CMM) using simulation lenses. |
| |
Login to enter a peer comment (or grade) |
trial erection Explanation: is what I would have said. Transmission line towers are ERECTED. Standard parlance in power projects. |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.