21:57 May 16, 2005 |
German to French translations [PRO] Tech/Engineering - Construction / Civil Engineering | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: George Vardanyan Local time: 17:02 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
1 | wall and foot wall construction |
|
wall and foot wall construction Explanation: j'espére, que vous pouvez utiliser la traduction anglais :( Wand-Sohle-Bauweise Die Herstellung des Straßentunnels erfolgte in offenen Baugruben. Zum Schutz der hydrogeologischen Situation, mit einem normalen Grundwasserspiegel von etwa 3,0 m unter der Geländeoberfläche und bei Verzicht auf eine Grundwasserabsenkung wurde die "Wand-Sohle-Bauweise" angewendet. Im Unterschied zu der im Regelfall angewendeten "Wand-Sohle-Bauweise" mit einfach rückverankerten Schlitzwänden wurde die Baugrubenwand in diesem Bereich mit mehreren horizontalen Ankerlagen im rückwärtigen Bugrund verankert. http://216.239.59.104/search?q=cache:IAJmBR4qQjoJ:www.stadte... Wall and Foot Wall Construction The construction of the road tunnel occurred in open building pits. A wall and foot wall construction method was used to protect the hydrogeological situation with its normal groundwater level of about 3.0 m below the surface of the site which successfully avoided lowering the groundwater level. In contrast to the wall and foot wall construction with single back-anchored diaphragm walls primarily used, in this area the wall of the building pit was anchored to the rear with several horizontal fixing devices. http://www.stadtentwicklung.berlin.de/bauen/strassenbau/en/t... |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.