ProZ.com global directory of translation services
 The translation workplace
Ideas
KudoZ home » Portuguese to English » Agriculture

instalados em série

English translation: installed in series


Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs
(or are passionate about them). Participation is free and the site has a strict confidentiality policy.
GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
Portuguese term or phrase:instalados em série
English translation:installed in series
Entered by: Christina Moreira
Options:
- Contribute to this entry
- Include in personal glossary

19:47 Sep 29, 2006
Portuguese to English translations [PRO]
Agriculture / Meio-Ambiente
Portuguese term or phrase: instalados em série
Por favor, como verter para o inglês a expressão *** instalados em série*** da frase abaixo:

"...composto por ciclones, lavadores de gases tipo Venturi, exaustores e chaminé, instalados em série."

Trata-se da descrição do processo de controle da emissão de gases resultantes na queima de madeira.
Christina Moreira
Brazil
Local time: 03:14
installed in series
Explanation:
Avaliou-se o efeito das águas residuárias de suinocultura com concentrações de sólidos suspensos totais em torno de 6.000 mg L-1 (DQOtotal variando de 7.557 a 11.640 mg L-1) no desempenho de processo anaeróbio em dois estágios compostos por reator compartimentado (ABR) e reator de fluxo ascendente com manta de lodo (UASB), instalados em série, em escala-piloto (volumes de 530 e 120 L, respectivamente),

In this work it was evaluated the effect of swine wastewater with total suspended solid (TSS) concentration around 6000 mg L-1 (CODtotal from 7557 to 11640 mg L-1) on the performance of two stage anaerobic process constituted of anaerobic baffled reactors (ABR) and an upflow sludge blanket reactor (UASB) installed in series, in pilot scale testing (volumes of 530 L and 120 L, respectively) and with hydraulic detention times (HDT) of 56 to 18 h in the first reactor and 13 to 4 h in the second reactor.

http://www.scielo.br/scielo.php?script=sci_abstract&pid=S010...



--------------------------------------------------
Note added at 1 hr (2006-09-29 21:29:30 GMT)
--------------------------------------------------

The shut-off valve is actuated by an electric solenoid. For added assurance, two solenoids are installed in series between the primary and secondary regulators. Factory Mutual (FM), Underwriter’s Laboratory (UL), and all other governing codes and utility requirements should be consulted for specific gas train requirements.
http://www.aircompressor.org/html/buyersguide/installation.h...
Selected response from:

Kim Metzger
Mexico
Local time: 01:14
Grading comment
Thanks Kim!
4 KudoZ points were awarded for this answer



Summary of answers provided
3 +1installed in series
Kim Metzger
3 +1serial installation
SwissTell


  

Answers


10 mins   confidence: Answerer confidence 3/5Answerer confidence 3/5 peer agreement (net): +1
serial installation


Explanation:
installation in series

SwissTell
Local time: 02:14
Native speaker of: Native in GermanGerman

Peer comments on this answer (and responses from the answerer)
agree  Susy Ordaz
1 hr
Login to enter a peer comment (or grade)

1 hr   confidence: Answerer confidence 3/5Answerer confidence 3/5 peer agreement (net): +1
installed in series


Explanation:
Avaliou-se o efeito das águas residuárias de suinocultura com concentrações de sólidos suspensos totais em torno de 6.000 mg L-1 (DQOtotal variando de 7.557 a 11.640 mg L-1) no desempenho de processo anaeróbio em dois estágios compostos por reator compartimentado (ABR) e reator de fluxo ascendente com manta de lodo (UASB), instalados em série, em escala-piloto (volumes de 530 e 120 L, respectivamente),

In this work it was evaluated the effect of swine wastewater with total suspended solid (TSS) concentration around 6000 mg L-1 (CODtotal from 7557 to 11640 mg L-1) on the performance of two stage anaerobic process constituted of anaerobic baffled reactors (ABR) and an upflow sludge blanket reactor (UASB) installed in series, in pilot scale testing (volumes of 530 L and 120 L, respectively) and with hydraulic detention times (HDT) of 56 to 18 h in the first reactor and 13 to 4 h in the second reactor.

http://www.scielo.br/scielo.php?script=sci_abstract&pid=S010...



--------------------------------------------------
Note added at 1 hr (2006-09-29 21:29:30 GMT)
--------------------------------------------------

The shut-off valve is actuated by an electric solenoid. For added assurance, two solenoids are installed in series between the primary and secondary regulators. Factory Mutual (FM), Underwriter’s Laboratory (UL), and all other governing codes and utility requirements should be consulted for specific gas train requirements.
http://www.aircompressor.org/html/buyersguide/installation.h...


Kim Metzger
Mexico
Local time: 01:14
Native speaker of: Native in EnglishEnglish
PRO pts in category: 4
Grading comment
Thanks Kim!

Peer comments on this answer (and responses from the answerer)
agree  R-i-c-h-a-r-d: Sounds better
46 mins
Login to enter a peer comment (or grade)




Return to KudoZ list


Changes made by editors
Sep 29, 2006:
Kudoz queueIn queue => Public


KudoZ™ translation help
The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.



See also: