ProZ.com global directory of translation services
 The translation workplace
Ideas
KudoZ home » Portuguese to English » Energy / Power Generation

por meio de intercepto "cut-off" a montante do eixo do barramento principal

English translation: by means of a cut-off interceptor upstream from the axis of the main dam..


Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs
(or are passionate about them). Participation is free and the site has a strict confidentiality policy.
GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
Portuguese term or phrase:por meio de intercepto "cut-off" a montante do eixo do barramento principal
English translation:by means of a cut-off interceptor upstream from the axis of the main dam..
Entered by: airmailrpl
Options:
- Contribute to this entry
- Include in personal glossary

22:16 Jul 14, 2011
Portuguese to English translations [PRO]
Tech/Engineering - Energy / Power Generation / Barragem
Portuguese term or phrase: por meio de intercepto "cut-off" a montante do eixo do barramento principal
...por meio de um intercepto impermeável “cut-off” a montante do eixo do barramento principal

Barragem com Seção Homogenia
- Altura de 46 m da elevação 114 à elevação 160 m e comprimento de 522 m;
- Escavação mecanizada a seco de Aluvião = 183 mil m3;
- Escavação mecanizada em área de empréstimo, carga, transporte e descarga de argila e argila com matacões, para distâncias de até 6 km – 1,6 milhões m3;
- Escavação na área de empréstimo com matacões, carga, transporte e descarga = 356 mil m3;
- Execução de aterro compactado com areia = 1,2 milhões m3;
- Execução de aterro compactado com argila em camadas de 25 cm a 95% do prócto normal = 1,02 milhões m3;
- Execução da parede diafragma com hidrofresa no aluvião/arenito para rebaixamento do sistema de rede de fluxo sob a barragem, aumentando o caminho de percolação da água por meio de um intercepto impermeável “cut-off” a montante do eixo do barramento principal = 5,4 mil m2.
mcirino
Local time: 02:00
by means of a cut-off interceptor upstream from the axis of the main dam
Explanation:
por meio de intercepto "cut-off" a montante do eixo do barramento principal => by means of a cut-off interceptor upstream from the axis of the main dam

Atlantis Flo-Cell High Strength Wall Drainage Blanket - Geotech ...
www.geotechsystems.co.nz/itemdetails/D0006...Flo.../705.asp... -
Deep fin cut-off / interceptor drain - Sport field drainage - Slope stabilization dewatering / drainage - Swampy ground dewatering / drainage ...

Mirafiо FW-Series Woven Geotextiles
www.tencate.com/TenCate/Geosynthetics/documents/.../PDS_FW0...
Cut-off/Interceptor Drain Along a Roadway. PDS.FW0210. TenCateTM Geosynthetics North America assumes no liability for the accuracy or completeness of this ...
Selected response from:

airmailrpl
Brazil
Local time: 02:00
Grading comment
Obrigado
4 KudoZ points were awarded for this answer



Summary of answers provided
4by means of a cut-off interceptor upstream from the axis of the main dam
airmailrpl


  

Answers


8 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5
by means of a cut-off interceptor upstream from the axis of the main dam


Explanation:
por meio de intercepto "cut-off" a montante do eixo do barramento principal => by means of a cut-off interceptor upstream from the axis of the main dam

Atlantis Flo-Cell High Strength Wall Drainage Blanket - Geotech ...
www.geotechsystems.co.nz/itemdetails/D0006...Flo.../705.asp... -
Deep fin cut-off / interceptor drain - Sport field drainage - Slope stabilization dewatering / drainage - Swampy ground dewatering / drainage ...

Mirafiо FW-Series Woven Geotextiles
www.tencate.com/TenCate/Geosynthetics/documents/.../PDS_FW0...
Cut-off/Interceptor Drain Along a Roadway. PDS.FW0210. TenCateTM Geosynthetics North America assumes no liability for the accuracy or completeness of this ...

airmailrpl
Brazil
Local time: 02:00
Specializes in field
Native speaker of: Native in EnglishEnglish, Native in PortuguesePortuguese
PRO pts in category: 66
Grading comment
Obrigado
Login to enter a peer comment (or grade)




Return to KudoZ list


Changes made by editors
Jul 16, 2011 - Changes made by airmailrpl:
Edited KOG entrymcirino's old entry - "por meio de intercepto \"cut-off\" a montante do eixo do barramento principal" => "by means of a cut-off interceptor upstream from the axis of the main dam"


KudoZ™ translation help
The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.



See also: