Spanish to English translations [PRO] Tech/Engineering - Engineering (general) | | Spanish term or phrase: Averiguar y marcar cables limpiando caja. | This is from the description of services from an invoice for a automotive/nautical/electrical/machinery company.
DESPLAZAMIENTO A PORT ADRIANO (MALLORCA), COMPROBAR FALLO EN SISTEMA ELECTRICO EN CUADRO PRINCIPAL UNIDAD CONDENSADORA CONDARIA (name of company), ENCONTRANDO LA PLACA PRINCIPAL DAÑADA POR CHISPAZO Y PARCIALMENTE QUEMADA, DAÑADO LAS MARCAS DE LOS CABLES.
AVERIGUAR Y MARCAR CABLES LIMPIANDO CAJA. DESMONTAR PLACA PARA SUSTITUCION.
NUEVO DESPLAZAMIENTO A PORT ADRIANO, INSTALAR PLACA NUEVA, MONTAR EN EL EQUIPO Y COMPROBAR EN SISTEMA FRIO Y CALOR EN SERVICIO, FUNCIONANDO CORRECTAMENTE |
| | | check state of cables and (re-)label them, while cleaning cabinet | Explanation: After a problem of the kind described in the ST it would be normal procedure to check the state of the cables (is the insulation sound?, have they been pitted by sparking?, etc...), mark/label the cables that are re-useable, (replace cables that are damaged - not mentioned in the ST) - and all that (except cable replacement) would be done in the same operation as cleaning up the mess in the cabinet. Where necessary, cable replacement (and labelling) would be done after the reuseable parts of the system had been made serviceable, along with replacement of the 'place principal'.
-------------------------------------------------- Note added at 1 hr (2011-09-13 22:51:58 GMT) --------------------------------------------------
Oops! - should read: "replacement of the 'placA principal'." |
| Selected response from: xxxmediamatrix Local time: 22:04
| Grading comment | 4 KudoZ points were awarded for this answer |
| |
| Discussion entries: 0 |
|---|
Automatic update in 00:
|
18 mins confidence:  
18 mins confidence:  
1 hr confidence:  peer agreement (net): +2 | averiguar y marcar cables limpiando caja. check state of cables and (re-)label them, while cleaning cabinet
Explanation: After a problem of the kind described in the ST it would be normal procedure to check the state of the cables (is the insulation sound?, have they been pitted by sparking?, etc...), mark/label the cables that are re-useable, (replace cables that are damaged - not mentioned in the ST) - and all that (except cable replacement) would be done in the same operation as cleaning up the mess in the cabinet. Where necessary, cable replacement (and labelling) would be done after the reuseable parts of the system had been made serviceable, along with replacement of the 'place principal'.
-------------------------------------------------- Note added at 1 hr (2011-09-13 22:51:58 GMT) --------------------------------------------------
Oops! - should read: "replacement of the 'placA principal'."
| xxxmediamatrix Local time: 22:04 Specializes in field Native speaker of: English PRO pts in category: 116
|
| |
Return to KudoZ list
| Changes made by editors |
|---|
| Sep 15, 2011 - Changes made by xxxmediamatrix: | | Created KOG entry | KudoZ term => KOG term |
| |
| | | | X Sign in to your ProZ.com account... | | | | |
| KudoZ™ translation helpThe KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases. See also: Search millions of term translations |