15:01 Jul 5, 2004 |
Spanish to English translations [PRO] Tech/Engineering - Mechanics / Mech Engineering | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Robert Tucker (X) United Kingdom Local time: 05:54 | ||||||
Grading comment
|
Allowing voltage to increase from the generating level Explanation: Allowing voltage to increase from the generating level |
| |
Login to enter a peer comment (or grade) |
allowing the rise in tension from the generating level Explanation: This is it... |
| |
Login to enter a peer comment (or grade) |
allowing for an increase in the voltage from the generating leve... Explanation: a subtle difference from the other answer(s) |
| |
Login to enter a peer comment (or grade) |
providing for the stepping up of the voltage from the generator level (22kV) Explanation: ... providing for the stepping up (or elevation) of the voltage from the generator level (22kV) to that for grid transmission (400kV). la fábricá permiterá una producción annual de ... the factory will /provide/make possible/ an annual production of ... Collins Spanish Dictionary In a typical transmission grid, substations at the generating plants step (transform) the medium voltage electric power (15 - 50 kV) up to high voltage (220 - 400 kV) alternating current (AC) for transmission over longer distances to a grid exit substation. www.wordiq.com/definition/Electric_power_transmission -------------------------------------------------- Note added at 2004-07-06 10:36:09 (GMT) -------------------------------------------------- la fábrica ... |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.