Track changes hindering project set-up Thread poster: Stéphanie Denton (X)
|
Stéphanie Denton (X) United Kingdom Local time: 07:53 French to English + ...
Hello Wondering if anyone can shed any light? Trying to put an 8k document into Studio 2009, the document is clean, no track changes to accept. However, when I come to running the project to get things started, I receive the following error message: This file cannot be converted because it contains tracked changes that have not been accepted or rejected. I have tried creating a new document, copying and pasting the content but to no avail. ... See more Hello Wondering if anyone can shed any light? Trying to put an 8k document into Studio 2009, the document is clean, no track changes to accept. However, when I come to running the project to get things started, I receive the following error message: This file cannot be converted because it contains tracked changes that have not been accepted or rejected. I have tried creating a new document, copying and pasting the content but to no avail. I've checked everywhere, but there are zero track changes! Thanks in advance. Stéph ▲ Collapse | | |
I've had this many times | Nov 17, 2011 |
Sometimes the track changes you can't see. Try accepting all changes and then saving to a new file. If that doesn't work, if it is a .doc save it to .docx or vice versa. This has always worked for me. eileen | | |
Natalie Poland Local time: 08:53 Member (2002) English to Russian + ... Moderator of this forum SITE LOCALIZER
check the existing threads in this forum: this has been already discussed several times. | | |
Stéphanie Denton (X) United Kingdom Local time: 07:53 French to English + ... TOPIC STARTER Not got the time | Nov 17, 2011 |
Natalie wrote: check the existing threads in this forum: this has been already discussed several times. To be traipsing through forums, if you have a lin that'd be great, but I'm on a tight schedule. | |
|
|
Adam Łobatiuk Poland Local time: 08:53 Member (2009) English to Polish + ... Another idea | Nov 17, 2011 |
Switch tracking changes on. Make a few changes. Now choose Accept all changes. This helps sometimes. | | |
Stéphanie Denton (X) United Kingdom Local time: 07:53 French to English + ... TOPIC STARTER
Adam Łobatiuk wrote: Switch tracking changes on. Make a few changes. Now choose Accept all changes. This helps sometimes. Have turned it on and off, and clicked accept all changes, there aren't any to accept or reject. Wearing my confused face... | | |
Emma Goldsmith Spain Local time: 08:53 Member (2010) Spanish to English |
Stéphanie Denton (X) United Kingdom Local time: 07:53 French to English + ... TOPIC STARTER
Thanks. Went into Project settings, then clicked Process documents with non accepted track changes. | |
|
|
Claudia Cherici Italy Local time: 08:53 Member (2010) English to Italian + ...
Hi Stephanie, and where did you find this item? "Process documents with non accepted track changes" thanks | | |
George Cook United Kingdom Local time: 07:53 French to English + ...
Claudia Cherici wrote: Hi Stephanie, and where did you find this item? "Process documents with non accepted track changes" thanks Project settings/File Types/Microsoft Word 2007-2010/other settings/Process documents with non accepted or rejected changes Check the box, and problem (theoretically) solved. | | |
Claudia Cherici Italy Local time: 08:53 Member (2010) English to Italian + ...
Thank you George! I'll try that too.... | | |