Trados 2015: copy source to target/clear target
Thread poster: Samuel Murray

Samuel Murray  Identity Verified
Netherlands
Local time: 08:17
Member (2006)
English to Afrikaans
+ ...
Sep 13, 2015

Hello everyone

I've newly upgraded to Trados 2015. How can I clear all target texts in one operation, and how can I copy source to target for all segments in one operation?

Thanks
Samuel


Direct link Reply with quote
 

Emma Goldsmith  Identity Verified
Spain
Local time: 08:17
Member (2010)
Spanish to English
Segment number column Sep 13, 2015

Select all segments like this:
Click segment 1 in the segment number column.
Use the shortcut Ctrl+end to go to the end of your file.
Click in the last segment in the segment number column using Shift+left-mouse button.

Now, right click on top of the segment number and select copy source to target or clear target.


Direct link Reply with quote
 

Walter Blaser  Identity Verified
Switzerland
Local time: 08:17
French to German
+ ...
To copy source you may also use SHIFT-ALT-INS Sep 13, 2015

Samuel

To copy the source text of alle segments to target, you can also use SHIFT-ALT-INS.
This is shorter because it does not require you to first select all segments.

Walter

[Bearbeitet am 2015-09-13 13:28 GMT]


Direct link Reply with quote
 

Mayumi Sasao  Identity Verified
Italy
Local time: 08:17
Member (2008)
Italian to Japanese
+ ...
Copy to source in all the segments with one operation in Trados Studio 2015 Sep 5, 2016

Hi
Today I found this solution that I'd like to share with all:
1. Go to Files stage in the navigation pane.
2. Visualize the source file.
3. Right click the name of the source file.
4. Select among Batch Tasks this option: "Copy to Target languages".

I also use Déjà Vu with which I can do the same operation through Pre-translate function. In Trados Studio, it was difficult to find how to do.

[Edited at 2016-09-05 18:59 GMT]


Direct link Reply with quote
 

Walter Blaser  Identity Verified
Switzerland
Local time: 08:17
French to German
+ ...
Not quite true Sep 8, 2016

Mayumi Sasao wrote:
Hi
Today I found this solution that I'd like to share with all:
1. Go to Files stage in the navigation pane.
2. Visualize the source file.
3. Right click the name of the source file.
4. Select among Batch Tasks this option: "Copy to Target languages".


Mayumi

I am afraid that you mix up two different things. The batch task you mention does not copy source segments to the target segments within a file, it copies the files in the source subfolder of the project into the target subfolder, which is an entirely different thing.

I also use Déjà Vu with which I can do the same operation through Pre-translate function. In Trados Studio, it was difficult to find how to do.


"Pretranslate" is again another thing. It does not copy source to target, it fills the target with the 100% matches it found in the translation memory.
Again, two completely different things.

Walter


Direct link Reply with quote
 


To report site rules violations or get help, contact a site moderator:


You can also contact site staff by submitting a support request »

Trados 2015: copy source to target/clear target

Advanced search







PerfectIt consistency checker
Faster Checking, Greater Accuracy

PerfectIt helps deliver error-free documents. It improves consistency, ensures quality and helps to enforce style guides. It’s a powerful tool for pro users, and comes with the assurance of a 30-day money back guarantee.

More info »
memoQ translator pro
Kilgray's memoQ is the world's fastest developing integrated localization & translation environment rendering you more productive and efficient.

With our advanced file filters, unlimited language and advanced file support, memoQ translator pro has been designed for translators and reviewers who work on their own, with other translators or in team-based translation projects.

More info »



Forums
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search