GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
14:09 May 23, 2013 |
Polish to English translations [PRO] Tech/Engineering - Manufacturing | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Marian Krzymiński Poland Local time: 01:52 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 | opening stroke |
|
opening stroke Explanation: Set the mold opening stroke The mold opening stroke is comprised of the core height, the part height, and the capsize space, as shown in Figure 5. You should minimize the mold opening stroke. The mold opening speed should be slow at the very beginning, then accelerate, then slow down again at the end of the stroke. The sequence of the mold closing speed is similar to the mold opening speed: slow, fast, slow. Z linku poniżej... Reference: http://tinyurl.com/o9am4m5 |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.