基础根开

English translation: foundation opening

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
Chinese term or phrase:基础根开
English translation:foundation opening
Entered by: SunnyShirley

02:32 Jun 22, 2005
Chinese to English translations [PRO]
Tech/Engineering - Construction / Civil Engineering
Chinese term or phrase: 基础根开
杆塔基础和拉线基础分坑及开挖检查记录表:
基础根开及对角线尺寸-
SunnyShirley
Local time: 07:59
foundation opening (hole dug for building the base of foundation)
Explanation:
..

--------------------------------------------------
Note added at 15 hrs 41 mins (2005-06-22 18:13:30 GMT)
--------------------------------------------------

base of foundation- footing
Selected response from:

billychang
Local time: 18:59
Grading comment
Thank you very very much!
4 KudoZ points were awarded for this answer



Summary of answers provided
3 +1foundation opening (hole dug for building the base of foundation)
billychang
3?
chica nueva


Discussion entries: 1





  

Answers


3 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5
基础根开
?


Explanation:
中国电力新闻网人才招聘 - [ Translate this page ]
作为质检员,我已经充分作好了“得罪”施工单位的准备,严格按照工程设计及相关规范要求,
对工程的基础掏挖、基础根开、混凝土水灰比等进行严密监控,不放过丝毫的工程质量隐患。
小陈是施工单位的技术员,他很自觉地配合我做好工作,在施工过程中从不“ ...
www.cpnn.com.cn/rczp/rzdl/200504140065.htm - 19k - Cached - Similar pages

国电电力建设研究所 - [ Translate this page ]
新万能试验基础:系大板式劲性钢筋混凝土结构,单腿上拔力3920 kN,试验塔最大根开19
米,最大倾覆力矩148960 kN.m. 组装场:100X200和45X40平方米. 横向液压加荷室: 16套
液压加荷装置,其中4套392 kN液压缸,6套196 kN液压缸,6套118 kN液压缸。 ...
www.epcri.com/xjsys/gtsyz/default.asp - 110k - Cached - Similar pages

CHINAPOWER会员中心 - [ Translate this page ]
输电线路杆塔的地下部分的总体统称为基础。它的作用是用来输电线路的杆塔。 输电线路
基础施工的任务就是按设计进行施工。 ... 联合基础 联合基础主要适用于基础根开较小且
基坑难以开挖、板式基础上拔土体重叠的软弱土塔位,其设计特点是埋深较浅,四个 ...
www.chinapower.com.cn/membercenter/ personalcenter/viewarticle.asp?articleid=10009546 - 13k - Cached - Similar pages

国电电力建设研究所 - [ Translate this page ]
国电电力建设研究所杆塔试验站,位于北京西南郊交通枢纽良乡镇北,是我国唯一的从事
输电线路真型杆塔科研、设计与试验的基地,也是 ... 新万能试验基础:系大板式劲性
钢筋混凝土结构,单腿上拔力3920 kN,试验塔最大根开19米,最大倾覆力矩148960 kN.m ...
www.epcri.com/xjsys/gtsyz/default.asp - 110k - Cached - Similar pages

架空绝缘配电线路施工及验收规程 - [ Translate this page ]
4.9 现场浇筑基础杆塔和拉线基础中的钢筋混凝土工程施工及验收,除应遵守本标准的规定
外,并应符合我国有关国家标准的规定。 ... 基础根开及对角线尺寸±2‰ ±1‰ ±7‰ 基础顶
面或主角钢操平印记间相对高差5 5 5 注: 1.转角塔基础的横线路方向是指内 ...
gq808.oot.cn/Article/ShowArticle.asp?ArticleID=57 - 58k - Cached - Similar pages

线路 - [ Translate this page ]
杆塔与基础设计因地制宜、使用合理。全线总塔数274基,每公里2.458基。直线ZV塔64基,
占23.358%;酒杯型自立塔195基, ... 钢量,在ZB2、ZB3自立塔的设计过程中,对铁塔根
开、主材的计算长度和斜材的布置方式,由计算机反复计算,特别是铁塔根开的确定, ...
www.jxepc.com.cn/jxdesign/psgc/psgcx.htm - 15k - Cached - Similar pages

架空绝缘配电线路施工及验收规程 - [ Translate this page ]
b) 基础位置偏差:拉环中心在拉线方向前、后、左、右与设计位置的偏差:1%L,L为拉环
中心至杆塔拉线固定点的水平距离。 ... d) 根开:±30mm。 5.15 线路横担的安装:直线
杆单横担应装于受电侧;900转角杆及终端杆当采用单横担时,应装于拉线侧。 ...
gq808.oot.cn/Article/ShowArticle.asp?ArticleID=57 - 58k - Cached - Similar pages

增强创新能力,应对“入世”挑战 - [ Translate this page ]
例中铁塔横担在紧凑型塔中悬挂跨度很大,塔体采用宽体及大根开外形,这时,空间钢结构
的受扭分析,以及塔体斜杆的埃菲尔效应 ... 我国500kV输电线路,以前曾出现过三次拉线
猫头塔倒塔事故,都多少与塔体埃菲尔效应有关。有一次事故是在特殊地形下,作用于 ...
www.ncpe.com.cn/tjzyw/news/sample.htm - 76k - Cached - Similar pages

35kV及以下架空电力线路施工及验收规范 - [ Translate this page ]
岩石基础坑的深度不应小于设计规定的数值。 第3.0.3条 双杆基坑应符合下列规定:.
一、根开的中心偏差不应超过±30mm。 二、两杆坑深度宜一致。 ... 第4.0.10条 线路单
横担的安装,直线杆应装于受电侧;分支杆、90°转角杆(上、下)及终端杆应装于拉线侧。 ...
www.jssafety.gov.cn/lyg/tiaozhuan. asp?id=1494&path=falvfagui%5C005safe.htm - 529k - Cached - Similar pages

中华人民共和国电力行业标准 - [ Translate this page ]
... a)基础尺寸偏差:断面尺寸,-1%;拉环中心与设计位置的偏移:20mm;. b)基础位置
偏差:拉环中心在拉线方向前、后、左、右与设计位置的偏差:1%L,L为拉环中心至
杆塔拉线固定点的水平距离。 ... 30. 30. 基础根开及对角线尺寸. ±2‰. ...
www.lcgdj.com/khzx/khzx/技术规程/ 架空绝缘配电线路施工及验收规程.htm - 101k - Supplemental Result - Cached - Similar pages

建筑施工 - [ Translate this page ]
... 高差; 3 基础立柱断面尺寸; 4 整基基础的中心位移及扭转; 5 混凝土强度;
6 回填土情况。 7、杆塔及拉线: 1 混凝土电杆焊接后焊接弯曲度及焊口焊接质量;
2 混凝土电杆的根开偏差,迈步及整基对中心桩的位移 ...
www.192new.com/Arch_Design_Spec_detail.asp?ColumnId=3734& lawId=3693&LawTypeId=20&StatuteId=3732 - 38k - Supplemental Result - Cached - Similar pages


chica nueva
Local time: 11:59
Native speaker of: English
PRO pts in category: 15

Peer comments on this answer (and responses from the answerer)
neutral  billychang: so which one is it ?
16 mins
Login to enter a peer comment (or grade)

3 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5 peer agreement (net): +1
基础根开
foundation opening (hole dug for building the base of foundation)


Explanation:
..

--------------------------------------------------
Note added at 15 hrs 41 mins (2005-06-22 18:13:30 GMT)
--------------------------------------------------

base of foundation- footing

billychang
Local time: 18:59
Works in field
Native speaker of: Native in EnglishEnglish, Native in ChineseChinese
PRO pts in category: 20
Grading comment
Thank you very very much!

Peer comments on this answer (and responses from the answerer)
agree  wherestip: agree. start the foundation// I agree, it is actually clearing the unwanted loose earth for the foundation, and in case of a tall structure a basement or hole needs to be dug
11 hrs
  -> Thanks. I don't know if start the foundation is the exact term because she has 及对角线尺寸 in the sentence also. It sounds like the diagonal measurement of the foundation opening or hole.
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also: