projektterv, feltöltött erőforrásokkal Explanation: - |
| |
Login to enter a peer comment (or grade) |
erőforrás-allokációs projektütemezés Explanation: It seems "erőforrás-allokáció" is the term used for "resource-loading". What is resource loading? Resource loading is the assignment of labour, materials & equipment that will be required to successfully complete a particular task or activity. https://www.linkedin.com/pulse/importance-resource-loading-p... allokáció 1, Valamely erőforrás szabad kapacitásának használatba vétele; https://idegen-szavak.hu/allokáció See also: https://www.google.hu/search?q=erőforrás-allokáció&ei=3AO7W7... -------------------------------------------------- Note added at 37 mins (2018-10-08 07:24:12 GMT) -------------------------------------------------- "Resource allocation, also called resource loading</by" https://yourbusiness.azcentral.com/resource-allocation-vs-re... -------------------------------------------------- Note added at 1 hr (2018-10-08 07:59:41 GMT) -------------------------------------------------- Beírok egy harmadik idézetet is: The main difference between resource allocation, also referred to as resource loading, and resource leveling https://www.reference.com/business-finance/difference-betwee... -------------------------------------------------- Note added at 1 hr (2018-10-08 08:04:59 GMT) -------------------------------------------------- Írok még kettő példát, talán ennyi elég lesz: ˇLoading (resource allocation)" oktato.econ.unideb.hu/kunandras/engMBA/SlidesPM/resources.ppt "Resource loading is basically allocating resources to the activities at the right time" https://www.coursehero.com/file/p6e7dj7/5-Resource-loading-a... |
| |
Login to enter a peer comment (or grade) |
resource loaded project schedule erőforrásokat részletező projekt ütemterv / erőforrás-részletező projekt ütemterv Explanation: www.taskmanagementguide.com/glossary/what-is-a-resource-loaded-schedule-.php Resource Loaded Schedule is a project-related schedule that consists of a timeline with details on allocated resources, planned activities and preset milestones. It is a time management document that explains how project resources (people, funds, inventories) are supposed to be consumed throughout scheduled project time and whether allocation rules appear to be effective to ensure appropriate resource consumption and use. Resource loaded schedule of a project is a great visual representation of how available project resources are allocated to scheduled activities. The project appears to be well scheduled when the overall project duration is defined by individual activity durations along with individual resource estimates. Resource loaded schedule is best used in combination with resource allocation plan so that the project manager can use both documents to analyze resource availability and schedule appropriateness and confirm both constraints (resources and time). Milestones will help the project manager to check the constraints against the baseline (original estimation of all project resources incl. time, HR, funds, materials) throughout the project implementation process. -------------------------------------------------- Note added at 1 hr (2018-10-08 08:17:15 GMT) -------------------------------------------------- https://pm-foundations.com/2011/03/21/pm-foundations-estimat... Itt különveszi az allocation és a loading folyamatát. Resource Allocation: The following steps describe the mechanics of this technique: Group activities based upon allocation of resources (may be one to one, but more likely will have activities with the same allocation over some period of time). Assign allocation % for each resource assigned to the activity in the Project Management tool. The Project Management tool computes the number of hours of work effort for the activities (based upon the allocation % and duration estimated for the activity). Resource Loading: Once the resource estimating process is complete, the mechanics of loading resources into the schedule is very straight forward. From the resource tab on the individual task, or from the resource column in the Gantt view (assuming you are using MS Project as your PM tool), the resources are added in the following manner (depending upon the approach selected): 1) Approach #1: Select the resource, enter the hours in the work column, and the % allocation will be computed. 2) Approach #2: Select the resource(s), enter the % in the units column, and the work hours will be computed. Another key element associated with the resource loading process is the task type set-up for the activity. Én Székány András ötlete (feltöltés) alapján erre jutottam: betöltött erőforrásokat tartalmazó ütemterv https://www.academiccourses.hu/Projektmenedzsment-2.-szint/N... Erőforrás betöltése |
| ||
Grading comment
| |||
Notes to answerer
| |||
Login to enter a peer comment (or grade) |
projekt leírása az erőforrások és a tervfeladatok megnevezésével Explanation: Nem fontos részletezni az erőforrásokat, de meg kell őket nevezni, ugyanúgy mint a projekten belüli tervfeladatokat. https://www.wrike.com/project-management-guide/faq/what-is-a-project-schedule-in-project-management/ |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.