KudoZ home » English to Arabic » Mechanics / Mech Engineering

Critical Path Management

Arabic translation: إدارة المسار الحرج

Advertisement

Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs
(or are passionate about them). Participation is free and the site has a strict confidentiality policy.
GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
English term or phrase:Critical Path Management
Arabic translation:إدارة المسار الحرج
Entered by: hassan zekry
Options:
- Contribute to this entry
- Include in personal glossary

09:01 Jul 8, 2009
English to Arabic translations [PRO]
Tech/Engineering - Mechanics / Mech Engineering
English term or phrase: Critical Path Management
Critical Path Management
rnuman
Local time: 10:42
إدارة المسار الحرج
Explanation:
.
Selected response from:

hassan zekry
Local time: 09:42
Grading comment
Selected automatically based on peer agreement.
4 KudoZ points were awarded for this answer

Advertisement


Summary of answers provided
5 +2إدارة المشروعات بطريقة المسار الحرج
Jafar Filfil
4 +3إدارة المسار الحرج
hassan zekry
5إدارة الطريق الحرج
Nadia Ayoub
4 +1ادارة المشاريع بطريقة الممر الحرج
HATEM EL HADARY


  

Answers


6 mins   confidence: Answerer confidence 5/5
critical path management
إدارة الطريق الحرج


Explanation:
this is project management terminology

Nadia Ayoub
Egypt
Local time: 09:42
Native speaker of: Arabic
PRO pts in category: 48
Login to enter a peer comment (or grade)

8 mins   confidence: Answerer confidence 4/5Answerer confidence 4/5 peer agreement (net): +3
critical path management
إدارة المسار الحرج


Explanation:
.

hassan zekry
Local time: 09:42
Works in field
Native speaker of: Native in ArabicArabic
PRO pts in category: 44
Grading comment
Selected automatically based on peer agreement.

Peer comments on this answer (and responses from the answerer)
agree  Nadia Ayoub: Actually this is the correct expression!
13 mins
  -> thanks Ms. Nadia; actually you tipped me off!

agree  Moodi
31 mins
  -> thanks Mr. Moodi

agree  Nidhalz
9 hrs
  -> thanks Mr. Walid
Login to enter a peer comment (or grade)

15 mins   confidence: Answerer confidence 4/5Answerer confidence 4/5 peer agreement (net): +1
critical path management
ادارة المشاريع بطريقة الممر الحرج


Explanation:
ادارة المشاريع بطريقة الممر الحرج

--------------------------------------------------
Note added at 16 mins (2009-07-08 09:18:42 GMT)
--------------------------------------------------

جامعة أم القرى - السيد محمد السيد مرزوق - ادارة المشاريع بطرقية الممر الحرج. الإشراف و التحكيم. العنوان, تاريخ البداية, تاريخ النهاية. - ماجستير ...
www.uqu.edu.sa/emmarzouk

--------------------------------------------------
Note added at 18 mins (2009-07-08 09:19:59 GMT)
--------------------------------------------------

تلخيص كتاب التغيير في المتغيرات من سلسلة الادارة المثلى - منتديات ...
31- استخدم تحليل الممر الحرج للمساعدة في تخطيط المهام. .... طرق التأثير في السلوك العوامل تحديد الأهداف كيفية استخدامها ...
vb.maharty.com/showthread.php?t=7241 - Copia cache - Simili

--------------------------------------------------
Note added at 21 mins (2009-07-08 09:23:15 GMT)
--------------------------------------------------

The Critical Path Method, abbreviated CPM, or Critical Path Analysis, is a mathematically based algorithm for scheduling a set of project activities. It is an important tool for effective project management.


History
It was developed in the 1950s by the Dupont Corporation at about the same time that General Dynamics and the US Navy were developing the Program Evaluation and Review Technique (PERT)[1] Today, it is commonly used with all forms of projects, including construction, software development, research projects, product development, engineering, and plant maintenance, among others. Any project with interdependent activities can apply this method of scheduling.


--------------------------------------------------
Note added at 25 mins (2009-07-08 09:27:32 GMT)
--------------------------------------------------

طريقة المسار الحرج - ويكيبيديا، الموسوعة الحرة - طريقة المسار الحرج ((Critical Path Method (CPM): هي إحدي الطرق المستخدمة في إدارة المشاريع تم تطويرها من قبل شركة دوبونت الأمريكية في عام 1957 لمعالجة مشكلة ...
ar.wikipedia.org/wiki/

HATEM EL HADARY
Italy
Local time: 09:42
Works in field
Native speaker of: Native in ArabicArabic, Native in EnglishEnglish
PRO pts in category: 11

Peer comments on this answer (and responses from the answerer)
agree  Rasha El-Gabry: agree
2 hrs
  -> many Thanks شـكــــــــرأً جــــزيـــلأً
Login to enter a peer comment (or grade)

31 mins   confidence: Answerer confidence 5/5 peer agreement (net): +2
critical path management
إدارة المشروعات بطريقة المسار الحرج


Explanation:
طريقة المسار الحرج هي أداة تعتمد على الشبكات والتي تنمذج نشاطات المشروع وعلاقتها بما قبلها وما بعدها
http://ar.wikipedia.org/wiki/إدارة_مشروعات

http://en.wikipedia.org/wiki/Critical_path_method

Jafar Filfil
Bulgaria
Local time: 10:42
Native speaker of: Native in ArabicArabic
PRO pts in category: 4

Peer comments on this answer (and responses from the answerer)
agree  Rasha El-Gabry: agree
1 hr
  -> Many thanks Rasha :)

agree  samah A. fattah
4 hrs
  -> Many thanks Samah :)
Login to enter a peer comment (or grade)




Return to KudoZ list


Changes made by editors
Jul 22, 2009 - Changes made by hassan zekry:
Created KOG entryKudoZ term » KOG term


KudoZ™ translation help
The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.



See also:



Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search