KudoZ home » English to Russian » Petroleum Eng/Sci

PIT

Russian translation: Pressure Integrity Test

Advertisement

Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs
(or are passionate about them). Participation is free and the site has a strict confidentiality policy.
08:37 Jun 28, 2007
English to Russian translations [PRO]
Tech/Engineering - Petroleum Eng/Sci / Well Control Issue
English term or phrase: PIT
UNDERSTAND THE PRESSURES – FRACTURE PRESSURE AWARENESS
Well Data Pressure & Density Data
D = Casing shoe depth (mTVD) V = Circ. pressure at slow pump rate (bar)
E = PIT (sg) at last casing shoe, or
F = LOT (sg) at last casing shoe W = Extra density provided by slow circulation rate (sg): = V/(A*0.098*Q)
kergap --
Russian Federation
Local time: 08:15
Russian translation:Pressure Integrity Test
Explanation:
A Pressure Integrity Test (PIT), sometimes called a leak-off test, is a field practice used to evaluate cement jobs and estimate the formation fracture gradient. Interpretation of the PIT becomes the basis for critical well decisions such as cement job evaluation, casing setting depths, mud weights, and well control alternatives. Incorrect interpretation of the PIT can lead to unnecessary squeeze jobs, premature setting of casing, lost circulation, or other costly problems that could jeopardize well progress.

http://cat.inist.fr/?aModele=afficheN&cpsidt=6241893
Selected response from:

Zoya Askarova
Singapore
Local time: 13:15
Grading comment
Спасибо!
4 KudoZ points were awarded for this answer

Advertisement


Summary of answers provided
3 +1Pressure Integrity Test
Zoya Askarova


  

Answers


22 mins   confidence: Answerer confidence 3/5Answerer confidence 3/5 peer agreement (net): +1
pit
Pressure Integrity Test


Explanation:
A Pressure Integrity Test (PIT), sometimes called a leak-off test, is a field practice used to evaluate cement jobs and estimate the formation fracture gradient. Interpretation of the PIT becomes the basis for critical well decisions such as cement job evaluation, casing setting depths, mud weights, and well control alternatives. Incorrect interpretation of the PIT can lead to unnecessary squeeze jobs, premature setting of casing, lost circulation, or other costly problems that could jeopardize well progress.

http://cat.inist.fr/?aModele=afficheN&cpsidt=6241893

Zoya Askarova
Singapore
Local time: 13:15
Specializes in field
Native speaker of: Russian
PRO pts in category: 354
Grading comment
Спасибо!

Peer comments on this answer (and responses from the answerer)
agree  Mark Epifantsev
2 hrs
  -> спасибо! :)
Login to enter a peer comment (or grade)




Return to KudoZ list


Changes made by editors
Jun 28, 2007:
Kudoz queueIn queue » Public


KudoZ™ translation help
The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.



See also:



Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search