fly jib Explanation: Guessing for the moment, but assuming "préflèche" has to mean something, maybe it's a "fly jib" : Fly jib - An extension provided at the top of some crane jibs to extend their reach. When not in use it is telescoped or folded under, or to the side of the main jib. [that is pasted from the web, but is identical to the def. given in the Scott/Penguin Dict. of Civil Engineering]. Pirates! -------------------------------------------------- Note added at 28 mins (2007-02-13 10:26:48 GMT) -------------------------------------------------- Or "pre-boom"! la hauteur de travail de la CX 800 passe de 23 à 40 m) ce qui permet de mieux rentabiliser la machine en démolition puis en terrassement. Le passage d’un outil à l’autre est effectué par une attache rapide hydraulique au niveau de la PRE FLECHE, les liaisons hydrauliques et électriques étant du type connecteurs rapides http://www.forum-chantiers.com/sejtbases/forum/fc43/dossier.... Elles peuvent être équipées de deux types de flèche : l’une monobloc à profil droit pour un travail continu, l’autre en deux parties avec flèche et PRE-FLECHE. Cette conception autorise après la démolition, le remontage rapide hydraulique ou mécanique sur la pré-flèche, d’une flèche de terrassement classique qui, avec trois types de balancier peut charger les déblais ou excaver. http://www.forum-chantiers.com/sejtbases/forum/fc12/fc0012re... For info, from my notes : Flèche Jib, boom (of crane) (jib if one piece, boom if articulated, as in excavators) [which is inconsistent with the term "fly jib" !!!] Le modèle 9046 Démolition est basée sur le modèle standard, spécialement adapté aux travaux de démolition mais qui, grâce à son système hydraulique d’attache rapide, peut être reconverti en configuration standard en à peine 30 minutes,. L’équipement de démolition se compose d’une flèche fixée à une pré-flèche par des axes amovibles hydrauliquement, permettant ainsi à l’ensemble de l’équipement de démolition d’être démonté très rapidement. La pré-flèche est prévue pour l’installation d’un équipement rétro de terrassement traditionnel http://www.casece.com/highlights/highlights.asp?RL=EUF&id=I3... What the hell! The 9046 Demolition is based on the standard model, adapted especially for demolition work but with the possibility of being converted back into a standard configuration machine in just 30 minutes, thanks to its hydraulic quick coupler system. The demolition attachment consists of a boom attached to a PRE-BOOM linked by hydraulically extractable pins, enabling the entire demolition attachment to be dismounted very quickly. The pre-boom provides for the installation of a tradtional, earthmoving backhoe attachment, enabling you to get the maximum use from the machine and to maximise your investment http://www.casece.com/highlights/highlights.asp?RL=EUE&id=I2... -------------------------------------------------- Note added at 31 mins (2007-02-13 10:29:28 GMT) -------------------------------------------------- OK, third bite at the apple : fly boom (which is consistent with comment above, at least). Meantime, fledgling crane maker Ronco has improved the R5000 with all-round suspension, top speed of 65km/h, increased reach with a fly boom attachment and ... www.ferret.com.au/articles/2e/0c013d2e.asp We have a 250t crane that has 60m of main boom, but it can also carry a "luffing fly" boom, of various lengths up to another 56m. ... www.skyscrapercity.com/showthread.php?t=242154 Tower Boom telescoped (fly boom extended). Cannot extend fly boom unless tower boom ... It is OK to use a lift as a crane as long as you do not exceed the ... www.sunbeltrentals.com/library/SBAWPS.4.03.pdf Fly Boom Extended. Extending the flyboom creates a special case. The flyboom is only used with all the sections at maximum extension. For this crane that is ... www.marineengineering.org.uk/Lfiting/LiftingoPS.HTM - |
| |||||||||||||
Notes to answerer
| ||||||||||||||
3 hrs confidence:
Login or register (free and only takes a few minutes) to participate in this question. You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy. KudoZ™ translation helpThe KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.
See also: Search millions of term translations Your current localization setting
English
Select a language Close search
|