3 | cross-sectional measurements cannot be done at short interval along the river |
| ||
3 | ...a precise cross-sectional span analysis cannot be undertaken. |
|
cross-sectional measurements cannot be done at short interval along the river Explanation: I think this is saying that the scross-sectional measurements cannot be done at as short an interval as they would like along the length of the river due to financial constraints. For instance, they are probably taking a measurement at every 10km along the length of the river, whereas they would like to do it at every 1km. |
| |
Login to enter a peer comment (or grade) |
...a precise cross-sectional span analysis cannot be undertaken. Explanation: I think your interpretation is correct, Steven. I interpret your sentence as: However, with problems of the (high) costs involved in surveying, the actual situation is that a precise cross-sectional span analysis cannot be undertaken. http://www.blackwell-synergy.com/doi/abs/10.1111/j.1752-1688... …Cross-sectional and longitudinal survey data from gated and unpaged streams were used to compute channel dimension and profile information. Power functions were developed, relating drainage area to bank full discharge, cross-sectional area, width, and mean depth…. http://vulcan.wr.usgs.gov/Projects/GPRadar/ground_penetratin... …accurate and timely determination of river-bed geometry is essential for discharge and sedimentation studies involving unstable river channels. Knowledge of stream-channel cross-sectional area is a critical component of any direct estimate of water discharge at flood stage, and, by extension,... The website below uses the phrase: span the entire width of the river, from bank to bank; APPENDIX H File Format: PDF/Adobe Acrobat - View as HTML assuming uniform cross-sectional velocity of the river stretch between the tracked ... span the entire width of the river, from bank to bank; secondly, ... www.ourpassaic.org/projectsites/premis_public/DM/index.cfm/... - Similar pages -------------------------------------------------- Note added at 5 hrs (2008-01-16 02:04:20 GMT) -------------------------------------------------- I opted to use "analysis" as the final results of the "measuring" but I measuring can also be substituted. |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.