5 +1 | commissioning |
|
commissioning Explanation: dwa linki z USA powinny wystarczyć: Pierwszy: Total Building Commissioning is the Public Buildings Service (PBS) process for quality assurance in new construction and facility modernization. It is the process for achieving, validating and documenting that the performance of the total building and its systems meet the design needs and requirements of the owner. Drugi: Building commissioning includes the following: Systematically evaluating all pieces of equipment to ensure that they are working according to specifications. This includes measuring temperatures and flow rates from all HVAC devices and calibrating all sensors to a known standard. Reviewing the sequence of operations to verify that the controls are providing the correct interaction between equipment. In particular, building commissioning activities include: Engaging a commissioning authority and team Documentation Verification procedures, functional performance tests, and validation Training. ...i to jest szczególnie ciekawe (wciąż drugi link): Building commissioning is not: Construction observation (punch list) START-UP Testing, adjusting and balancing (TAB) Final punch-out Reference: http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=8... Reference: http://www.eere.energy.gov/buildings/operate/buildingcommiss... |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.