19:51 May 6, 2018 |
Russian to English translations [PRO] Tech/Engineering - Electronics / Elect Eng | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Sergei Kvardakov Russian Federation Local time: 21:22 | ||||||
Grading comment
|
start of power generation/power supply to the system Explanation: start of power generation - for generating station(s) start of power supply to the system - for the transmitting part |
| |
Login to enter a peer comment (or grade) |
[for] the system to which voltage is applied Explanation: Alternative: [for] the subsystem to which voltage is applied. Alternative 2: [for] the system [(or part thereof)] to which voltage is applied. (Context is needed to select between these 3 answers.) (Explanation for my answers here in general: It is usually desirable for a translator not to try to edit the author.) (Incidentally, "capacity commissioning" in my opinion is incorrect for "Динамика ввода мощностей". It is out of context and unidiomatic. I would suggest (again trying not to edit the author): "Dynamics of power input". "Мощность" means "power" in the present context, not "capacity". |
| ||
Notes to answerer
| |||
Login to enter a peer comment (or grade) |
connection to the grid Explanation: FSK - Annual Report 2015 - Инвестиции в развитие электросетевой инфраструктуры http://report2015.fsk-ees.ru/reports/fsk/annual/2015/gb/Russ... See the diagram “Динамика ввода мощностей ФСК (постановка под напряжение)” Here’s a direct link to the diagram: http://report2015.fsk-ees.ru/fsk/annual/2015/gb/layout/pic/6... == BEGIN QUOTE == Транформаторная мощность, тыс. МВА Линии электропередачи, тыс. км == END QUOTE == |
| |
Login to enter a peer comment (or grade) |
voltage production Explanation: https://www.researchgate.net/figure/Voltage-production-accor... |
| |
Login to enter a peer comment (or grade) |
energized assets Explanation: Grids/wires are getting live when they are energized, or set under voltage. So, I would translate your diagram as 'Changes in FSK capacity additions/energized assets' |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.