3 | connection pit |
|
Discussion entries: 1 | |
---|---|
connection pit Explanation: No creo que la respuesta a la consulta de la referencia sea correcta. Mira este link que es el resumen de un trabajo traducido al inglés: http://www.google.com.cu/url?sa=t&rct=j&q=&esrc=s&source=web... RESUMEN DEL PROYECTO El presente proyecto desarrolla el diseño y construcción de la estación de bombeo de aguas residuales E.B.A.R. 3 prevista en el Plan General de Ordenación Urbana (PGOU) del municipio de Majadahonda en la Comunidad de Madrid. Dicha estación impulsa las aguas residuales de las áreas urbanas denominadas en el PGOU como Carralero I y II y Hospital Puerta de Hierro en la zona sur y Pinar y Mapfre en la zona este del municipio, hasta el centro de reparto (cámara de rotura CR- 1) que entronca con la infraestructura de saneamiento procedente de la cuenca Norte. La estación de bombeo está localizada junto a la calle Isaac Albeniz de Majadahonda en una zona situada entre la autopista M-50 y la autovía M-503. This Project develops the design and building of the pumping station of wastewater E.B.A.R. 3 foreseen in the Urban Development Plan (PGOU) of Majadahonda in the Autonomous Community of Madrid. The station pumps wastewater from the urban areas of Carralero I y II and Hospital Puerta de Hierro in the Southern zone and Pinar y Mapfre in the Eastern zone of the municipality to a connection pit with the Northern wastewater infrastructure. The pumping station will be located in the Isaac Albeniz street of Majadahonda in a zone between the highways M-50 and M-503. The infrastructure to be built is composed of a connection pit with the existing wastewater network, the pumping station itself and a pressure pipe. However, the scope of the project is limited to the determination of the design flow, the type and number of pumps, the pumping pit design, and the pipes and accessories sizing. |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.