GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
03:56 Jan 18, 2008 |
Spanish to English translations [PRO] Tech/Engineering - Construction / Civil Engineering | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Alvin Adams, Jr (X) Local time: 07:02 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 +1 | meter skid |
| ||
4 | metering skid |
|
meter skid Explanation: patin = skid (in this context) Reference: http://www.welkereng.com/wfms/portfolio/liquid_skids.htm |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
metering skid Explanation: http://www.meekerequipment.com/splash_aps.html Meeker Asphalt Metering Skids The Meeker mass flow asphalt metering skid is a system designed for high efficiency and accuracy when measuring the percentage of liquid asphalt into your drum mix facility. With the soaring cost of oil you want to make sure of the volume of liquid asphalt being injected into each ton of hot mix being produced. Controlling quality is where the Meeker mass flow metering skid gives you the advantage. http://www.alderleygroup.com/products and services/Metering ... For almost every metering skid that Alderley provides, a metering control system is required. The Alderley scope includes for the integration of the flow computers that interconnect with the skid instrumentation, and with the Human Machine Interface (HMI), or Supervisory System which provides the platform for the information recorded by the flow computer to be presented in a clear and concise format for the operation and maintenance of the Metering System. Alderley can choose from its own E2000 range of flow computers, or we can integrate almost all of the widely available third party flow computers, e.g. OMNI 6000. http://www.cnrl.com/client/surplus/122/123/meteringskidsoct.... Metering Skid , 2 - uni-flow meter's 2"300# w/ 2- Barton 202A recorders, set up for four inlets 2"- 3"- 4" , Outlet 4"300#, also has 4" pig Launcher, Skid and Building 12 x 12' x 8' |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.