This site uses cookies.
Some of these cookies are essential to the operation of the site,
while others help to improve your experience by providing insights into how the site is being used.
For more information, please see the ProZ.com privacy policy.
Freelance translator and/or interpreter, Verified site user
Data security
This person has a SecurePRO™ card. Because this person is not a ProZ.com Plus subscriber, to view his or her SecurePRO™ card you must be a ProZ.com Business member or Plus subscriber.
Affiliations
This person is not affiliated with any business or Blue Board record at ProZ.com.
English to Chinese: Implementation of Inspection Solution General field: Tech/Engineering
Source text - English 8. Build corrosion data and prepare for full RBI Program. A full RBI Program will be initiated by gathering all available data relating to operations within the unit through conducting workshops/interviews as well as receiving existing hard/soft copy data from the unit. The required data may include:
a. Inspection history (reports include repairs (esp. postKweld heat treatment (PWHT), replacements and actual damage rates) and a summary of significant findings for
equipment and pipelines (e.g. active thinning, cracking, metallurgical damages and past failures (with root cause))
b. Process Fluid Stream (PFS) including damage-causing chemicals (DCCs)
c. Pressure and Temperature for vessels and piping and historical operational changes and excursions – this data would include temperature, pressure, material, DCC composition, fluid phase or flow rates/velocity changes. These changes should be tabulated with the date of change and details regarding the change such as the reason for the change and the affected locations
d. Equipment and connected piping in intermittent service (or normally not in service) during normal plant operation
e. Walk down/visual inspection of all corrosion loops, checking for items such as:
i. Internal piping deterioration:
1. Localized corrosion or cracking locations
2. Erosion or corrosion locations
ii. External piping deterioration (under insulation)
1. Carbon Steel corrosion and Stainless Steel stress corrosion cracking areas
iii. Piping fatigue:
1. Vibration Locations
2. Pressure or Thermal Cyclic loads
iv. Piping high temperature creep
Translation - Chinese 8. 建立腐蚀数据,制定完整的RBI规程。完整的RBI规程由收集所有与装置运行有关的数据开始,方式为访谈和调研,以及从装置获得已有的纸质/电子数据。所需的数据包括:
a. 腐蚀检测历史(报告包括维修(特别是焊后热处理、更换和实际损伤率)和设备、管线重要发现的总结(如正在发生的减薄、开裂、冶金损伤和过去的失效(带原因))
b. 工艺介质流,包括导致损伤的化学品(DCC)
c. 容器和管道的压力和温度,及历史运行变化和偏移——这些数据包括温度、压力、材料、DCC成分、液相或流速变化。这些变化应制成表格,记录变化日期和变化详细内容,如产生变化的原因和受到影响的位置
d. 在工厂正常运行期间间断使用(或通常不使用)的设备和连接的管道
e. 走动/目视检测所有腐蚀回路,检查以下项目:
i. 管道内部退化:
1. 局部腐蚀或开裂位置
2. 侵蚀或腐蚀位置
ii. 管道外部退化(保温层内)
1. 碳钢腐蚀和不锈钢应力腐蚀开裂区域
iii. 管道疲劳:
1. 震动位置
2. 压力或热循环荷载
iv. 管道高温蠕变
More
Less
Translation education
Bachelor's degree - Chongqing University
Experience
Years of experience: 12. Registered at ProZ.com: Feb 2018.
English to Chinese (National Accreditation Authority for Translators and Interpreters, verified) English to Chinese (CATTI by Ministry of Personnel, China) Chinese to English (National Accreditation Authority for Translators and Interpreters, verified) Chinese to English (CATTI by Ministry of Personnel, China)
Competence: I’m a freelance translator with 6 years’ experience. I provide translation, review and proofreading services. I have NAATI and CATTI certifications provided by Australian and Chinese translation authorities. I have professional-level linguistic proficiency as well a deep understanding of the technology background which allows me to deliver accurate and reliable translation.