This site uses cookies.
Some of these cookies are essential to the operation of the site,
while others help to improve your experience by providing insights into how the site is being used.
For more information, please see the ProZ.com privacy policy.
Breaking The Barrier To The Passage Of Information
Account type
Translation agency/company employee or owner
Data security
This person has a SecurePRO™ card. Because this person is not a ProZ.com Plus subscriber, to view his or her SecurePRO™ card you must be a ProZ.com Business member or Plus subscriber.
Affiliations
This person is not affiliated with any business or Blue Board record at ProZ.com.
Source text - English 1. Acceptance Criteria’s
The criteria’s for the acceptance of the system follows the technical requirements of the system.
All criteria’s have to be tested and evaluated.
The results of the acceptance test should be within the accepted tolerances.
Centre thickness accuracy ± 0.1 % or ± 0.05 µm whichever is greater
Thickness profile accuracy ± 0.15 %
Crown measurement accuracy ± 0.2 %
Wedge measurement accuracy ± 0.2 %
Edge drop measurement accuracy ± 0.2 %
Width measurement accuracy ± 1 mm (2σ)
Availability of the Profile System
Calculated as follows:
A= [(Tt – Tl)/ Tt] x 100%
A …. Availability percentage
Tt …. Total time to be in use
Tl ..... Time lost due to faults of the system
99.7 %
2. Acceptance Procedure
The test will be executed with certified cold samples which have all the same known chemical composition.
The samples are delivered with the system (option) or will be provided by the customer. The dimensions of the sheets and the definition of the thickness will be agreed with the customer.
The samples cover the whole material thickness range of the specific application.
It will be used approx. 10 samples for the calibration. It is possible to use also combinations of these samples.
1. Calibration
The test procedure starts with the calibration of the system. 10 samples will be put manually in the measuring system.
After this calibration procedure the calibration curve will be stored in the system and used for the measuring of the system.
2. Confirmation of the measuring accuracy
Centre line measurement
The confirmation of accuracy of the thickness measurement will be performed with 3 samples. The samples are at approx. 10%, 50% and 90% of the upper range value. Each sample will be put several times in the beam path and the value recorded, displayed and listed in a form.
The values will be checked with the nominal value.
Profile measurement
For the profile measurement each array will be tested. We divide the strip in four parts (each array) and confirm the accuracy for each single array.
The samples will be put into the beam path and the values will be recorded. With the recorded values the average of the sample will be calculated and compared with the nominal value. The difference between the recorded and the nominal value have to be within the guaranteed values.
3. Width measurement
For the width measurement several certified cold samples provided by the customer will be used for the confirmation of the width measurement accuracy.
The sample will be put under the measuring device at several positions and the width value will be recorded.
The recorded values have to be within the offered guaranteed values.
Translation - English 1. Acceptance Criteria’s
1.验收标准
The criteria’s for the acceptance of the system follows the technical requirements of the system.
该系统验收标准符合系统的技术要求。
All criteria’s have to be tested and evaluated.
所有标准须经过测试及评估。
The results of the acceptance test should be within the accepted tolerances.
验收测试结果应该达到规定容限。
Centre thickness accuracy
中心厚度精度 ± 0.1 % or ± 0.05 µm whichever is greater
任一较大
Thickness profile accuracy
厚度凸度精度 ± 0.15 %
Crown measurement accuracy
凸度测量精度 ± 0.2 %
Wedge measurement accuracy
楔度测量精度 ± 0.2 %
Edge drop measurement accuracy
边缘降测量精度 ± 0.2 %
Width measurement accuracy
宽度测量精度 ± 1 mm (2σ)
Availability of the Profile System
凸度系统之可用性
Calculated as follows:
计算如下:
A= [(Tt – Tl)/ Tt] x 100%
A …. Availability percentage
A.。可用性百分比
Tt …. Total time to be in use
Tt。。。。总使用时间
Tl ..... Time lost due to faults of the system
Tt 。。。因系统故障所失去的时间
99.7 %
2. Acceptance Procedure
2 验收程序
The test will be executed with certified cold samples which have all the same known chemical composition.
应用鉴定合格,并包括相同已知化学元素的冷样品,以实施测试工作。
The samples are delivered with the system (option) or will be provided by the customer. The dimensions of the sheets and the definition of the thickness will be agreed with the customer.
样品可随该系统一起发货(可选)或者由客户提供。钢板尺寸及厚度说明须争得客户的同意。
The samples cover the whole material thickness range of the specific application.
样品要保持在整个应用材料的厚度范围内。
It will be used approx. 10 samples for the calibration. It is possible to use also combinations of these samples.
校准须应用大约十个样板。使用合用的样板是可行的。
1. Calibration
1. 校准
The test procedure starts with the calibration of the system. 10 samples will be put manually in the measuring system.
该测试程序要与该系统校准同时开始。十个样板将手动放到测量系统上。
After this calibration procedure the calibration curve will be stored in the system and used for the measuring of the system.
校准程序结束后,校准曲线将存入该系统中并应用于该系统的测量。
2. Confirmation of the measuring accuracy
2. 测量精度的确认
Centre line measurement
中线测量
The confirmation of accuracy of the thickness measurement will be performed with 3 samples. The samples are at approx. 10%, 50% and 90% of the upper range value. Each sample will be put several times in the beam path and the value recorded, displayed and listed in a form.
厚度精度的测量须使用三个样品进行确认。样品大约要保持在上限值的百分之十,五十和九十这个范围。然后每个样品都要多次放到光路上,这样数值就会存入表格中,并自动显示和排列。
The values will be checked with the nominal value.
检查得到数值须参照额定值来进行。
Profile measurement
凸面测量
For the profile measurement each array will be tested. We divide the strip in four parts (each array) and confirm the accuracy for each single array.
对于凸面测量,每个阵列都要进行测试。我们把带钢分成四个部分(每个阵列),然后对每个单独阵列的精度进行确认。
The samples will be put into the beam path and the values will be recorded. With the recorded values the average of the sample will be calculated and compared with the nominal value. The difference between the recorded and the nominal value have to be within the guaranteed values.
样品放到光路上,测量值就会被记录下来。根据记录的测量值,样品的平均值就会算出来,然后再对照额定值。记录值和额定值间的差距必须在保证数值之内。
3. Width measurement
宽度测量
For the width measurement several certified cold samples provided by the customer will be used for the confirmation of the width measurement accuracy.
The sample will be put under the measuring device at several positions and the width value will be recorded.
对于宽度测量,由客户提供的几个冷样品将用于宽度测量精度的确认工作。
The recorded values have to be within the offered guaranteed values.
记录值必须保持在所提供保障值的范围内。
English: Specification General field: Tech/Engineering Detailed field: Construction / Civil Engineering
Source text - English Review and approval of drawings by the Project Manager shall not relieve the Contractor in any way of his obligation to meet all requirements specified herein, or the responsibility for the correctness of such drawings. The Sub-contractor shall make any changes in design, which are necessary to ensure the work conforms to the provisions and intent of the purchase order without additional cost to the Project Manager or the Client.
Translation - English 图纸虽经项目经理审阅和批准后,承包商仍有义务满足本文件中提出的所有要求,有责任保证这些图纸的正确性,若有必要,承包商应对设计进行必要的修改,使其符合采购合同的条款和目的,并不给项目经理或客户带来额外的费用。
English: 10KV Switchboards 10KV
Source text - English 10KV switchboard and associated equipment, switchgear, busbar assemblies, contactors, etc. shall be manufactured to GB3906-2006, DL404-2007 as well as to IEC-298 and be suitable for operation at indoor room conditions of (1) –10 ~ 40°C in temperature and (2) less than 90% relative humidity and be type tested in a High Voltage Testing Laboratory
Translation - English 10KV 开关柜及相关的设备,开关,母线系统,接触器等根据GB3906-2006,DL404-2007及IEC-298制造使用于室内操作环境包括:(1)环境温度-10~ 40°C;(2)相对湿度小于90%并经过高压试验所型式试验。
English: toolbox meeting General field: Tech/Engineering Detailed field: Construction / Civil Engineering
Source text - English The toolbox meeting is conducted by the respective contractors of individual trades to their workers under their charge, where specific issues of the SWMS or updates of them are discussed, agreed and implemented.
Translation - English 工具箱会议由各个承包商的各个包段对其管辖的员工召开,其间应讨论、协定和贯彻安全施工方案中具体的事务或更新。
More
Less
Experience
Years of experience: 7. Registered at ProZ.com: Jan 2007.
CCT is an innovative LSP(Language Serive Provider) since 2006 based in Shanghai, China, offering language services, including technical translation & interpretation and language support , with fast response system.
We take care of every aspect of every project we work on inhouse or onsite. Each member of our team has their own areas of expertise within the field of literature translation , in-field interpretation, document translation and writting, so we can provide end-to-end language service solution or bespoke services for individual account.
Adhering to the principle that no project is too big or too small for us to consider, we stand still till now in the harsh market.
For more information, please visit our website or write us an email to [email protected]
This user has reported completing projects in the following job categories, language pairs, and fields.