Свинтить и поставить на палец??
Sequence of operations
1. Make up and set back premium grade DC 5”, 19.5 lb/ft, ±500m.
Note: Diverter function test is required.
2. RIH with BHA for drilling 26” hole and circulate conductor with seawater with several pills of high-viscosity fluid. Circulate the borehole clean with maximum pump capacity to ± 5m off the conductor shoe
POOH with circulation, set back BHA
Sequence of operations
1. Make up and set back premium grade DC 5”, 19.5 lb/ft, ±500m.
Note: Diverter function test is required.
2. RIH with BHA for drilling 26” hole and circulate conductor with seawater with several pills of high-viscosity fluid. Circulate the borehole clean with maximum pump capacity to ± 5m off the conductor shoe
POOH with circulation, set back BHA