Glossary entry

English term or phrase:

“impacted-as-planned”

Arabic translation:

التأثير المتوقع

Added to glossary by Seham Ebied
Apr 9, 2017 14:11
7 yrs ago
18 viewers *
English term

“impacted-as-planned”

English to Arabic Tech/Engineering Construction / Civil Engineering
The impacted as-planned method of delay analysis is a technique which forecasts or predicts a delay’s effect on a project’s completion date. This delay analysis method involves the insertion or addition of activities representing delays or changes into the baseline schedule to determine the impact of those delay activities. Use of the impacted as-planned schedule analysis method is generally restricted to the quantification of delays for contemporaneous requests for time extensions.
Change log

Apr 9, 2017 14:29: Murad AWAD changed "Field" from "Other" to "Tech/Engineering"

May 2, 2017 10:48: Seham Ebied Created KOG entry

Proposed translations

15 mins
Selected

التأثير المتوقع

طريقة التأثير المتوقع
https://prof-planner.blogspot.com/2015/01/blog-post_26.html
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Thanks"
15 mins

تحليل التأخير باستخدام تحليل الجدولة الزمنية التخطيطية المتأثرة I

تأخير انتهاء المشروع

--------------------------------------------------
Note added at 16 mins (2017-04-09 14:27:57 GMT)
--------------------------------------------------

http://esst5.com/artical_details_Show.aspx?FileID=Mjg0
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search