Sep 17, 2007 17:57
17 yrs ago
English term
PMA
English to Russian
Tech/Engineering
Petroleum Eng/Sci
drilling
Ensure that the local operations office / HSEQ are informed about the operations start-up at least 24 hours in advance
Ensure that the PMA is at the site and that it has been discussed with the entire personnel
The mud logging unit will be installed during rig mobilization and must start operating from the beginning of the operation with data transmission in real time.
Ensure that the PMA is at the site and that it has been discussed with the entire personnel
The mud logging unit will be installed during rig mobilization and must start operating from the beginning of the operation with data transmission in real time.
Proposed translations
(Russian)
1 | President’s Management Agenda | maxomel |
Proposed translations
35 mins
4 KudoZ points awarded for this answer.
Comment: "Спасибо!"
Something went wrong...