Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
4 Mar 21 '12 eng>por construction site clerk escriturário de obra pro closed ok
4 Apr 28 '08 eng>por Modified Puls Method Método Puls Modificado pro closed ok
- Mar 8 '06 eng>por aerator aerador pro closed ok
- May 22 '04 eng>por detail of work specifically excluded detalhamento do trabalho explicitamente excluído pro closed ok
- May 4 '04 eng>por pipe culvert galeria pro closed ok
4 Apr 23 '04 eng>por Planning permision passos para obtenção da resposta easy closed no
- Apr 14 '04 eng>por ablutions abluções pro closed no
4 Mar 19 '04 eng>por Irish flow crossing cruzamento de fluxo irlandês pro closed no
- Mar 10 '04 eng>por fuseplug fusível pro closed ok
- Mar 9 '04 eng>por repoint rejuntar pro closed ok
- Feb 20 '04 eng>por soft body impact impacto de corpo mole pro closed ok
4 Feb 20 '04 eng>por thermal conductivity = 0,54 W/m.K condutividade térmica = 0,54 W/m.K pro closed ok
4 Feb 20 '04 eng>por two impacts of the chisel dois impactos (duas pancadas) do formão pro closed ok
- Feb 20 '04 eng>por Block-outs positioned to facilitate roof trusses block-outs posicionados para facilitar as treliças do telhado pro closed ok
- Feb 20 '04 eng>por Trusses and battens treliças e sarrafos pro closed no
4 Feb 20 '04 eng>por The slots for the location of roof trusses os espaços p/ locação (posicionamento / colocação) das tesouras (ou treliças ou armações) do telhado pro closed ok
4 Feb 19 '04 eng>por moulded formwork system sistema de fôrma moldada por injeção pro closed ok
4 Feb 13 '04 eng>por haunching abaulamento pro closed ok
- Feb 13 '04 eng>por spot mortar chapisco pro closed no
Asked | Open questions | Answered