This site uses cookies.
Some of these cookies are essential to the operation of the site,
while others help to improve your experience by providing insights into how the site is being used.
For more information, please see the ProZ.com privacy policy.
VIA AILooking for an interpreter?
Remoto by ProZ.com connects you with an identity-verified interpreter by video or phone in about 60 seconds — 300+ languages, on demand or booked ahead.
Try Remoto »
Working languages:
English to Chinese Chinese to English
Client-vendor relationship recorded successfully!
Johnney Li has been added to your list of hired vendors.
This person has a SecurePRO™ card. Because this person is not a ProZ.com Plus subscriber, to view his or her SecurePRO™ card you must be a ProZ.com Business member or Plus subscriber.
Affiliations
This person is not affiliated with any business or Blue Board record at ProZ.com.
Rates per language pair: English to Chinese - Standard rate: 0.15 USD per word / 40 USD per hour
Portfolio
Sample translations submitted: 2
English to Chinese: SAADEC Introduction
Source text - English
建设世界一流的高效、安全、环保、对
社会负责的现代化高科技矿井
Build the First-class High-effective Environment-protected Modernized Hi-tech Safe Coalmine in the World
山西亚美大宁能源有限公司成立于2000年5月12日。是由美国亚美大陆煤炭公司、山西兰花科技创业股份有限公司(2004年12月收购前股东晋城市大宁煤炭有限公司在合作公司的36%的全部股权)和山西省煤炭运销总公司晋城分公司三家业内资深企业投资的中外合作大型煤炭企业。目标是建立世界一流的高效、安全、环保的现代化高科技矿井。已批准并投资到位的注册资金5,360万美元。投资总额13,800万美元。出资比例为56:36:8。
Shanxi Asian American-Daning Energy Co., Ltd (SAADEC) was established in May 12th 2000. SAADEC is a large-scale sino-foreign joint mining enterprise invested by three shareholders, Asian American Coal, Inc (56% ownership); Shanxi Lanhua Sci-tech Venture Co., Ltd (36% ownership); and Shanxi Coal & Sales Transportation Corporation Jincheng Branch comapy (8% ownership). Shanxi Lanhua Sci-tech Venture Co., Ltd has bought SAADEC 36% ownership from previous shareholder Jincheng Daning Coal Company. The goal of SAADEC is to build the First-class Highly-effective Environment-protected Modernized Hi-tech Safe Coalmine in the World.
矿井项目,注册资金4,400万美元,投资总额11,000万美元。实收资本4,400万美元,从中国工商银行晋城市分行融资3.7亿元人民币(等值4,500万美元)已到位。尚存在2,100万美元的资金缺口。在2004年12月15日董事会上股东承诺若在融资不到位的情况下,为了保障项目顺利如期完成,由股东全部出资。The registered capital for project of Daning mine is 44 million USD. Total investment amount’s 110 millions USD. The actual received capital’s 44 million USD. The 370 million RMB (equal to 45 million USD) financing lease from Jincheng Branch of Industrial and Commercial Bank of China has been received. Fund is still in lack of 21 million USD. In the board meeting hold in December 15th 2005, shareholders had promised to fund SAADEC if the financing fund is not procured in order to guarantee the project can be accomplished successfully as scheduled time.
在工程建设方面,地面土建完成的有生产调度楼、仓库、设备维修库、6KV开闭所、污水处理厂房;井巷建设有主斜井、通风巷、运输巷、瓦斯抽放系统、回风井;设备有连采机2台、梭车4台、铲车6台、破碎机2台、移动变电站6台、锚杆机4台、皮带运输机7部,长壁采煤设备已于2004年10月前全部定货,于2005年2月到货。
In the aspect of civil engineering, dispatching building, warehouse, maintenance workshop, 6KV switch station and sewage water treatment room had been constructed on the surface. Main slope and auxiliary slopes, ventilation entries, transportation entries, methane degassing system and air bleed shaft had also been constructed. In the aspect of equipment, SAADEC has 2 continuous miner, 4 shuttle cars, 6 scoops, 2 feeder breakers, 6 movable power centers, 4 roof bolters and 7 belt conveyors. SAADEC longwall mining equipment had been ordered in October 2004, and will be arrived from February 2005.
截止2005年1月31日,累计完成建设投资计人民币9.67亿元,其中已转固定资产投资3.60亿元人民币,在建工程0.97亿元人民币,进口设备采购预付款3.16亿元人民币,土地使用权0.26亿元人民币,工程物质1.22亿元人民币,采矿权0.10亿元人民币,其他资产0.36亿元人民币(前期费用0.28亿元人民币,递延资产0.08亿元人民币)。
Accumulated mount of investment unto SAADEC was 967 million RMB by the date of January 31st 2005, including 360 million RMB of fixed assets, 97 million RMB for projects under construction, 316 million RMB for prepaid asset of imported equipment, 26 million RMB for usufruct of land, 122 million RMB of project material, 10 million RMB of mining accession, and 36 million RMB of other miscellaneous assets (28 million RMB of first-phase expense; 8 million RMB of deferred asset).
矿井项目将于2005年7月投产期。
SAADEC Longwall production will be started in July 2005.
洗煤厂项目已获得国家相关部门必要的审批,注册资本960万美元,投资总额2,800万美元。实收资本960万美元,尚需融资1,840万美元。在2004年12月15日董事会上股东承诺若在融资不到位的情况下,为了保障项目顺利如期完成,由股东全部出资。
The project of Coal Preparation Plant has been approved by relevant State departments. Register capital is 9.6 million USD. Total investment is 28 million USD. 9.6 million USD capital has been received actually. 18.4 million USD still needs to be financed. In the board meeting hold in December 15th 2005, shareholders had promised to fund SAADEC if the financing fund is not procured in order to guarantee the project can be accomplished successfully as scheduled time.
洗煤厂项目总包商是业内资深企业——澳大利亚约翰芬雷公司承建。2005年1月31日,洗煤厂累计完成投资0.65亿元人民币。其中土建0.2亿元人民币,进口设备0.45亿人民币。目前正在进行项目施工。
The project of SAADEC coal preparation plant is constructed by Australia John & Finley Company. 65 million RMB had been invested progressively unto coal preparation plant by January 31st 2005, including 20 million RMB of civil construction; 45 million of imported equipment. Project is now being constructed.
该项目于2005年7月完工。
This project will be completed in July 2005.
阳城亚美大宁铁路专线营运有限公司于2003年4月18日在阳城县工商局注册。由山西亚美大宁能源有限公司、山西省煤炭运销总公司晋城分公司和阳城县商品公路开发公司共同出资1.016亿人民币,投资总额2.9亿人民币。出资比例44:31.4:24.6。
In April 18th 2003, Yangcheng Asian American Daning Railroad Spur Co., Ltd was registered in the Industrial and Commerce Bureau of Yangcheng County. 101.6 million RMB has been invested by three shareholders; Shanxi Asian American-Daning Energy Co., Ltd, Shanxi Coal & Sales Transportation Corporation Jincheng Branch comapy, and Commercialized Highway Development Company of Yangcheng County. The total investment is 290 million RMB. Investment proportion of three shareholders are 44:31.4:24.6.
公司现有职工人数20人,设有行政部、财务部、协调部、工程部。
There are 20 employees in Spur Company that includes Department of Administration, Department of Finance, Department of Coordination and Department of Engineering.
该项目资金已全部落实到位,土地申购已获得国家相关部门的批准。工程的招标已完成,现正在进行施工。
All funds for this project had already been received. Land Procurement application for this project had also been approved by relevant state departments. Public bidding invitation had been completed. This project is now under construction.
截止2005年1月31日,累计完成投资1.69亿元人民币,其已转固定资产0.01亿元人民币,在建工程1.05亿元人民币,其他资产0.63亿元人民币。
169 million RMB had been invested unto this project by the date of January 31st 2005, including 1 million RMB of fixed asset, 105 million for projects under construction, 63 million RMB of miscellaneous assets.
该项目于2005年11月完工。
This project will be completed in November 2005.
山西亚美大宁能源有限公司采用国际先进的3A管理模式,实施人才兴矿战略。公司共设16部门,现有员工586人。其中高级管理人员30多名,高级工程师及其他高级技术人员50多名,硕士以上人员10多名,大专以上学历100多名。专科以上200多名。
The internationally advanced AAA management mode is adopted, and strategy of making mine prosperous with intellectual person is also adopted by Shanxi Asian American-Daning Energy Co., Ltd. There are 16 departments and 586 employees in SAADEC, including more than 30 advanced management, more than 50 advanced engineers and technicians, SAADEC has more than 10 employees with master’s degree or above, more than 100 employees with junior college degree or above, more than 200 employees with technical school degree or above.
公司的经营理念是融合中西方管理文化,用最高的安全标准和世界一流的管理理念成功地建设和开发中国首家中外合营煤炭矿山。
SAADEC vision is to merge western and Chinese management cultures to develop and operate the first underground coal mining joint venture in China, with the highest safety standards and world class operating principles.
公司的使命是站在世界煤炭行业安全管理和环境保护的前列。建设长期稳定高产高效的企业,造福地方,不断改善员工的生活质量。为员工提供持续受教育和培训的机会,建设一支有理想、有文化、有道德、守纪律的职工队伍。源,不断寻找其他商业机会增加股东投资收益。
The mission of SAADEC is: to be among the leaders of international coal industry in safety management and environmental protection; to provide a long-term and productive enterprise that is supporting the local community and improving the quality of lives of our employees; to develop continuing education and training programs for our employees; to build workface with great ideality, good education, professional ethics and disciplines-abiding quality; and to maximize the recovery of the company’s mineral resources and continually look for additional business opportunities to enhance the shareholders’ investment.
目前,我公司各项工程建设健康有序的进行,公司总经理海德龙先生(美籍)和副总经理张秦安先生(中国籍)带领公司管理团队信心百倍的为实现公司的总体战略目标而奋斗。
Miscellaneous SAADEC projects are now under construction. SAADEC management team will endeavor to achieve the overall strategic goal of company with fully hearted confidence, under the leadership of company GM-Ron Hite (American) and DGM-Zhang Qin’an.
2005年2月
February. 2005
Translation - Chinese
建设世界一流的高效、安全、环保、对
社会负责的现代化高科技矿井
Build the First-class High-effective Environment-protected Modernized Hi-tech Safe Coalmine in the World
山西亚美大宁能源有限公司成立于2000年5月12日。是由美国亚美大陆煤炭公司、山西兰花科技创业股份有限公司(2004年12月收购前股东晋城市大宁煤炭有限公司在合作公司的36%的全部股权)和山西省煤炭运销总公司晋城分公司三家业内资深企业投资的中外合作大型煤炭企业。目标是建立世界一流的高效、安全、环保的现代化高科技矿井。已批准并投资到位的注册资金5,360万美元。投资总额13,800万美元。出资比例为56:36:8。
Shanxi Asian American-Daning Energy Co., Ltd (SAADEC) was established in May 12th 2000. SAADEC is a large-scale sino-foreign joint mining enterprise invested by three shareholders, Asian American Coal, Inc (56% ownership); Shanxi Lanhua Sci-tech Venture Co., Ltd (36% ownership); and Shanxi Coal & Sales Transportation Corporation Jincheng Branch comapy (8% ownership). Shanxi Lanhua Sci-tech Venture Co., Ltd has bought SAADEC 36% ownership from previous shareholder Jincheng Daning Coal Company. The goal of SAADEC is to build the First-class Highly-effective Environment-protected Modernized Hi-tech Safe Coalmine in the World.
矿井项目,注册资金4,400万美元,投资总额11,000万美元。实收资本4,400万美元,从中国工商银行晋城市分行融资3.7亿元人民币(等值4,500万美元)已到位。尚存在2,100万美元的资金缺口。在2004年12月15日董事会上股东承诺若在融资不到位的情况下,为了保障项目顺利如期完成,由股东全部出资。The registered capital for project of Daning mine is 44 million USD. Total investment amount’s 110 millions USD. The actual received capital’s 44 million USD. The 370 million RMB (equal to 45 million USD) financing lease from Jincheng Branch of Industrial and Commercial Bank of China has been received. Fund is still in lack of 21 million USD. In the board meeting hold in December 15th 2005, shareholders had promised to fund SAADEC if the financing fund is not procured in order to guarantee the project can be accomplished successfully as scheduled time.
在工程建设方面,地面土建完成的有生产调度楼、仓库、设备维修库、6KV开闭所、污水处理厂房;井巷建设有主斜井、通风巷、运输巷、瓦斯抽放系统、回风井;设备有连采机2台、梭车4台、铲车6台、破碎机2台、移动变电站6台、锚杆机4台、皮带运输机7部,长壁采煤设备已于2004年10月前全部定货,于2005年2月到货。
In the aspect of civil engineering, dispatching building, warehouse, maintenance workshop, 6KV switch station and sewage water treatment room had been constructed on the surface. Main slope and auxiliary slopes, ventilation entries, transportation entries, methane degassing system and air bleed shaft had also been constructed. In the aspect of equipment, SAADEC has 2 continuous miner, 4 shuttle cars, 6 scoops, 2 feeder breakers, 6 movable power centers, 4 roof bolters and 7 belt conveyors. SAADEC longwall mining equipment had been ordered in October 2004, and will be arrived from February 2005.
截止2005年1月31日,累计完成建设投资计人民币9.67亿元,其中已转固定资产投资3.60亿元人民币,在建工程0.97亿元人民币,进口设备采购预付款3.16亿元人民币,土地使用权0.26亿元人民币,工程物质1.22亿元人民币,采矿权0.10亿元人民币,其他资产0.36亿元人民币(前期费用0.28亿元人民币,递延资产0.08亿元人民币)。
Accumulated mount of investment unto SAADEC was 967 million RMB by the date of January 31st 2005, including 360 million RMB of fixed assets, 97 million RMB for projects under construction, 316 million RMB for prepaid asset of imported equipment, 26 million RMB for usufruct of land, 122 million RMB of project material, 10 million RMB of mining accession, and 36 million RMB of other miscellaneous assets (28 million RMB of first-phase expense; 8 million RMB of deferred asset).
矿井项目将于2005年7月投产期。
SAADEC Longwall production will be started in July 2005.
洗煤厂项目已获得国家相关部门必要的审批,注册资本960万美元,投资总额2,800万美元。实收资本960万美元,尚需融资1,840万美元。在2004年12月15日董事会上股东承诺若在融资不到位的情况下,为了保障项目顺利如期完成,由股东全部出资。
The project of Coal Preparation Plant has been approved by relevant State departments. Register capital is 9.6 million USD. Total investment is 28 million USD. 9.6 million USD capital has been received actually. 18.4 million USD still needs to be financed. In the board meeting hold in December 15th 2005, shareholders had promised to fund SAADEC if the financing fund is not procured in order to guarantee the project can be accomplished successfully as scheduled time.
洗煤厂项目总包商是业内资深企业——澳大利亚约翰芬雷公司承建。2005年1月31日,洗煤厂累计完成投资0.65亿元人民币。其中土建0.2亿元人民币,进口设备0.45亿人民币。目前正在进行项目施工。
The project of SAADEC coal preparation plant is constructed by Australia John & Finley Company. 65 million RMB had been invested progressively unto coal preparation plant by January 31st 2005, including 20 million RMB of civil construction; 45 million of imported equipment. Project is now being constructed.
该项目于2005年7月完工。
This project will be completed in July 2005.
阳城亚美大宁铁路专线营运有限公司于2003年4月18日在阳城县工商局注册。由山西亚美大宁能源有限公司、山西省煤炭运销总公司晋城分公司和阳城县商品公路开发公司共同出资1.016亿人民币,投资总额2.9亿人民币。出资比例44:31.4:24.6。
In April 18th 2003, Yangcheng Asian American Daning Railroad Spur Co., Ltd was registered in the Industrial and Commerce Bureau of Yangcheng County. 101.6 million RMB has been invested by three shareholders; Shanxi Asian American-Daning Energy Co., Ltd, Shanxi Coal & Sales Transportation Corporation Jincheng Branch comapy, and Commercialized Highway Development Company of Yangcheng County. The total investment is 290 million RMB. Investment proportion of three shareholders are 44:31.4:24.6.
公司现有职工人数20人,设有行政部、财务部、协调部、工程部。
There are 20 employees in Spur Company that includes Department of Administration, Department of Finance, Department of Coordination and Department of Engineering.
该项目资金已全部落实到位,土地申购已获得国家相关部门的批准。工程的招标已完成,现正在进行施工。
All funds for this project had already been received. Land Procurement application for this project had also been approved by relevant state departments. Public bidding invitation had been completed. This project is now under construction.
截止2005年1月31日,累计完成投资1.69亿元人民币,其已转固定资产0.01亿元人民币,在建工程1.05亿元人民币,其他资产0.63亿元人民币。
169 million RMB had been invested unto this project by the date of January 31st 2005, including 1 million RMB of fixed asset, 105 million for projects under construction, 63 million RMB of miscellaneous assets.
该项目于2005年11月完工。
This project will be completed in November 2005.
山西亚美大宁能源有限公司采用国际先进的3A管理模式,实施人才兴矿战略。公司共设16部门,现有员工586人。其中高级管理人员30多名,高级工程师及其他高级技术人员50多名,硕士以上人员10多名,大专以上学历100多名。专科以上200多名。
The internationally advanced AAA management mode is adopted, and strategy of making mine prosperous with intellectual person is also adopted by Shanxi Asian American-Daning Energy Co., Ltd. There are 16 departments and 586 employees in SAADEC, including more than 30 advanced management, more than 50 advanced engineers and technicians, SAADEC has more than 10 employees with master’s degree or above, more than 100 employees with junior college degree or above, more than 200 employees with technical school degree or above.
公司的经营理念是融合中西方管理文化,用最高的安全标准和世界一流的管理理念成功地建设和开发中国首家中外合营煤炭矿山。
SAADEC vision is to merge western and Chinese management cultures to develop and operate the first underground coal mining joint venture in China, with the highest safety standards and world class operating principles.
公司的使命是站在世界煤炭行业安全管理和环境保护的前列。建设长期稳定高产高效的企业,造福地方,不断改善员工的生活质量。为员工提供持续受教育和培训的机会,建设一支有理想、有文化、有道德、守纪律的职工队伍。源,不断寻找其他商业机会增加股东投资收益。
The mission of SAADEC is: to be among the leaders of international coal industry in safety management and environmental protection; to provide a long-term and productive enterprise that is supporting the local community and improving the quality of lives of our employees; to develop continuing education and training programs for our employees; to build workface with great ideality, good education, professional ethics and disciplines-abiding quality; and to maximize the recovery of the company’s mineral resources and continually look for additional business opportunities to enhance the shareholders’ investment.
目前,我公司各项工程建设健康有序的进行,公司总经理海德龙先生(美籍)和副总经理张秦安先生(中国籍)带领公司管理团队信心百倍的为实现公司的总体战略目标而奋斗。
Miscellaneous SAADEC projects are now under construction. SAADEC management team will endeavor to achieve the overall strategic goal of company with fully hearted confidence, under the leadership of company GM-Ron Hite (American) and DGM-Zhang Qin’an.
2005年2月
February. 2005
Chinese to English: Service Agreement Detailed field: Tourism & Travel
Translation - English Dormitory Buildings A & B Service Subsidiary Agreement
Party A: XXX
Party B: YYY
Both parties sign the Service Agreement pertaining to the rear service in 2006, and carry it out from January 2006.
Dormitory building A and B entered into using from September first, joint venture UG front line workers have been arranged inside for living.
Range of scope and expense in Service Agreement signed previously does not include range of service of dormitory A & B as well as expense.
After the negotiation, both parties have reached to the consensus of opinion pertaining to payment of dormitory building A and B service and service expenditure, signed this agreement, and shall follow it together.
I. Content of Service and Standard
1. Content of Service:
Party B provides Party A’s employees service of boarding house in dormitory building A and B, and be responsible for relevant management.
II. Standard of Service
Party B should provide the following service and reach standards of regulations
(1). Be responsible for sanitary sanitation of employees’ dormitories and public areas, such as, corridors, employees’ activity room etc, and clean up the outdoor environmental circumstance of buildings.
Requirements: Clean neat in dormitories, corridors, outdoor environment. No trash, no paper, no stub of cigarette, no vestige of spit, no abnormal smell in toilet rooms.
(2). Regularly wash and replace employees’ bed sheet, the bedding bag, the pillow covering and so on.
Requirements: Bed sheet sets neat and clean, have no dirt.
(3). Gate guard on duty 24 hours
Requirement: Carry on the registration to all people who do not live in the buildings and the external personnel, if any suspicious situation is discovered, Security Department should be prompt contacted to handle with it.
(4). Be responsible to service and maintain illumination facility in buildings. In the warranty period, the project contractor, the equipment providers should service and maintain. Party B is just maintain the room, replace illumination appliance in stairs and activity rooms; such as, replacement of bulb, lamp.
Requirements: Can guarantee the normal illumination in the rooms, the corridors and the activity rooms.
Other Maintenance:
If any facility beyond the range of scope of agreement is damaged and needs maintenance, service personnel should promptly inform Party B. Party B shall contact project contractor and equipment provider. Project contractor and equipment provider will maintain in timely manner.
II. Confirmation of Service Expense, Payment and Usage.
1. Range of Service Expense Payment
Service Expense in this agreement is reimbursed on an actual expenditure basis and only includes the relevant service expenditures pertaining to dormitory A and B.
(1). Expenditure of wages for service personnel of dormitory buildings A and B;
(2). Cleaning articles used inside and outside dormitory buildings A and B,
(3). Expenditure to replace the damageable articles beyond the warranty range of project dormitory buildings A and B, such as, lamp, bulb, etc.
(4). Relevant other expenditure pertaining to dormitory buildings A and B.
The following expenditures are excluded in this service expenses in this agreement.
(1). Relevant expenditure paid by Party A pertaining to dormitory building A & B;
(2). Washing articles and TV program fees supposed to be paid by employees.
2. Confirmation of Service Expense.
Party B should submit the relevant monthly service expenditures to Party A’s Administration Department for confirmation, then send copies to Internal Control and Finance Departments for archive saving.
3. Payment of Service Expense.
Service expense of dormitory buildings A and B, and service expense in Service Agreement shall be settled and paid after verification. Process of payment should be carried out according to payment approval procedure of Party A.
4. Others.
Party B should use assigned fund for assigned purpose after receiving service expense from Party A. The expenditure of this assigned fund should be daily supervised and audited regularly by Internal Control and Finance Departments from Party A; that is, assigned person shall be sent from Internal Control and Finance every half a year to particularly audit the using of service expenses.
III. Right and Obligation of Both parties
Right and Obligation of Party A:
1. Party A pays Party B service expense according to regulations in this agreement;
2. Evaluation Award and Penalty shall be carried out according to Item 1 and 2 in Service Contract.
Right and Obligation of Party B:
Party B should provide service to Party A according to items of service and standards confirmed in this agreement.
IV. Others
1. As a supplement of the service agreement signed previously, this subsidiary service agreement has the same legal effect compared with previous service agreement.
2. This agreement shall enter into force after it signed by bilateral parties. Time Duration of execution: From September 1, 2006 to December 31, 2006. Both parties may continuously sign contract via negotiation when contract expires.
3. Both parties can negotiate the issue that has not concluded in this agreement. If there is no result via negotiation, arbitration can be submitted to administration of arbitration.
4. This agreement is written in Chinese and English. Four copies for each language. Party A and the Party B will get two copies respectively and all copies have the same legal effect. Where any discrepancy arises between the English version and the Chinese version, the Chinese version shall prevail.
Party A (Seal)
Party B (seal)
Representative:
Representative:
Date: Date: