mission d'etude travaux

English translation: heating design assignment

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
French term or phrase:mission d'etude travaux
English translation:heating design assignment
Entered by: Scott de Lesseps

17:36 Nov 21, 2008
French to English translations [PRO]
Tech/Engineering - Construction / Civil Engineering
French term or phrase: mission d'etude travaux
Travaux d'electricite, mission d'etude travaux de chauffage en 2006

Another item in a list of work to be done on a building.

feasibility study?
Scott de Lesseps
United States
Local time: 02:48
heating design assignment
Explanation:
However, hard to know if "assignment" is necessary. It might be the whole design of the heating system (heating design) or just one aspect of the whole (heating design assignment).

Of course it might also be design work for some aspect of the installation of the heating system, not of the actual heating system itself, e.g. how the pipes should be routed, or how they should be attached to reduce risk of damage in earthquakes .... The world is your oyster!

I wouldn't restrict it to just feasibility studies or any other design phase.

Additionally, it COULD be short for "mission d'étude ET travaux", in which case it's heating design AND installation.

You'll have to make decisions, I feel, based on other information about this person/company/
Selected response from:

Bourth (X)
Local time: 08:48
Grading comment
This answer seemed to fit best in the context. Thanks to everyone!

Scott
4 KudoZ points were awarded for this answer



Summary of answers provided
4feasibility study for heating installation
Susana Martin Dudoignon
3survey
ecolliar
4 -1design of work survey
Giorgio Tenedios (X)
2research assignment on heating work (experimental heating system to be installed)
MatthewLaSon
1heating design assignment
Bourth (X)


Discussion entries: 4





  

Answers


1 hr   confidence: Answerer confidence 4/5Answerer confidence 4/5
feasibility study for heating installation


Explanation:
Hi,
To me it looks like there might be a word missing, 'mission d'étude pour travaux de chauffage'.
Therefore:
Feasibility study for heating works or heating installations,
or study for proposal of heating works.
Good luck,

Susana Martin Dudoignon
Spain
Local time: 08:48
Works in field
Native speaker of: Spanish
Login to enter a peer comment (or grade)

1 hr   confidence: Answerer confidence 1/5Answerer confidence 1/5
heating design assignment


Explanation:
However, hard to know if "assignment" is necessary. It might be the whole design of the heating system (heating design) or just one aspect of the whole (heating design assignment).

Of course it might also be design work for some aspect of the installation of the heating system, not of the actual heating system itself, e.g. how the pipes should be routed, or how they should be attached to reduce risk of damage in earthquakes .... The world is your oyster!

I wouldn't restrict it to just feasibility studies or any other design phase.

Additionally, it COULD be short for "mission d'étude ET travaux", in which case it's heating design AND installation.

You'll have to make decisions, I feel, based on other information about this person/company/

Bourth (X)
Local time: 08:48
Specializes in field
Native speaker of: Native in EnglishEnglish
PRO pts in category: 4135
Grading comment
This answer seemed to fit best in the context. Thanks to everyone!

Scott
Login to enter a peer comment (or grade)

2 hrs   confidence: Answerer confidence 2/5Answerer confidence 2/5
research assignment on heating work (experimental heating system to be installed)


Explanation:
Hello,

They're going to install some new heating system to see how well it works out.

It's just a guess.

MatthewLaSon
Local time: 02:48
Native speaker of: Native in EnglishEnglish
PRO pts in category: 119
Login to enter a peer comment (or grade)

4 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5
survey


Explanation:
A feasibilty study could also be a survey and I think it sits better in this context. I would suggest: work to be done on electricity, survey carried out on central heating works in 2006

ecolliar
United Kingdom
Local time: 07:48
Native speaker of: English

Peer comments on this answer (and responses from the answerer)
neutral  B D Finch: A feasibility study is about future possibility, whereas a survey is about the current or past state of things.
11 hrs
  -> Yes a survey is about the current condition but in preparation for future work whereas a feasibilty study is to check the viability of a project not the conditions on which the work will be carried out. Also there is a reference to 2006.
Login to enter a peer comment (or grade)

13 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5 peer agreement (net): -1
design of work survey


Explanation:
A survey for the feasibility of the work to be executed

Giorgio Tenedios (X)
Italy
Local time: 08:48
Specializes in field
Native speaker of: Native in EnglishEnglish, Native in ItalianItalian
PRO pts in category: 31

Peer comments on this answer (and responses from the answerer)
disagree  B D Finch: Feasibility studies involve future projections. Surveys are about describing the existing. What is a "design of work survey"? Sounds wrong to me.
2 hrs
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search