Glossary entry (derived from question below)
Portuguese term or phrase:
sonda de completação
English translation:
completion rig or workover rig or pulling unit
Portuguese term
sonda de completação
Thanks
In
Advance!
4 +1 | completion rig or workover rig or pulling unit | Claudio Mazotti |
May 21, 2010 08:20: Claudio Mazotti changed "Edited KOG entry" from "<a href="/profile/59045">Salvador Scofano and Gry Midttun's</a> old entry - "sonda de completação "" to ""completion rig or workover rig or pulling unit""
May 21, 2010 08:21: Claudio Mazotti changed "Edited KOG entry" from "<a href="/profile/59033">Claudio Mazotti's</a> old entry - "sonda de completação "" to ""completion rig or workover rig or pulling unit""
Proposed translations
completion rig or workover rig or pulling unit
www.lonestarsecurities.com/Book-CH-IV.htm
This type of oil rig is commonly called by several names such as completion rig, workover rig, or pulling unit. The terms are interchangeable and mean that the rig is usually only capable of pulling pipe (tubing) in and out of the well. It consists of a large truck with a drawworks (large winch) and a telescoping mast built onto the bed and chassis. The truck is backed up to a well that has already been drilled, the mast is raised and extended, and the work begins. This rig only requires three men to operate and only works during the daytime. These rigs cannot drill unless equipped with a special equipment package called a “power swivel.” This type of rig is used to “complete,” repair, or swab existing wells. It is a general service type of equipment that can do many things, but is primary used to remove tubing from a well or place tubing in the well. Companies that supply this type of equipment are Key Energy Services, Pool Workover Services, and Basic Well Services.
www.glgroup.com › ... › GLG Industry Dictionary
employed.
Workovers are often necessary in older wells, which may need smaller diameter tubing, scale or paraffin removal, acid matrix jobs, or completing new zones of interest in a shallower reservoir. Such remedial work can be performed using workover rigs – also known as pulling units or completion rigs – to pull and replace tubing, or by the use of well intervention techniques utilizing coiled tubing. Depending on the type of lift system and wellhead a rod rig or flushby can be used to change a pump without pulling the tubing.
www.en.wikipedia.org/wiki/Oil_well
Something went wrong...