Glossary entry

English term or phrase:

Joist Bracing at 1'-0" o/c

French translation:

contreventement des solives à 1' 0" (33cm) (entraxes)

Added to glossary by FX Fraipont (X)
Apr 29, 2013 16:39
11 yrs ago
English term

Joist Bracing at 1'-0" o/c

English to French Tech/Engineering Construction / Civil Engineering Construction details for building an ice hut
Hi
This is a very technical document. I understand that o/c stands for "over centre" but can't find the French equivalent. So: "Solive renforcée...?" Merci d'avance!
Change log

May 5, 2013 04:54: FX Fraipont (X) Created KOG entry

Discussion

Tony M Apr 29, 2013:
Context? Asker, I think we need more of your wider context here; both of the quite different answers suggested so far are entirely plausible, but only your wirder context can help you decide.

Specifially, are we talking about bracing OF the joists (as F-X has suggested); or that it is the joists themselves that ARE the bracing? The EN is totally ambiguous on this point, so only the wider context MAY clarify this point...

Proposed translations

+3
21 mins
Selected

contreventement des solives à 1' 0" (33cm) (entraxes)

http://s56.photobucket.com/user/jraabe/media/blocking.jpg.ht...

--------------------------------------------------
Note added at 32 mins (2013-04-29 17:11:59 GMT)
--------------------------------------------------

"PLANCHERS [200 fiches] - TERMIUM Plus® — Recherche ...
http://www.btb.termiumplus.gc.ca/tpv2alpha/alpha-fra.html?la...
OBS – On distingue deux sortes de contreventement des solives: le ...... souvent par des madriers de section 8 x 22 cm et l'entraxe le plus courant est de 33 cm."

--------------------------------------------------
Note added at 1 hr (2013-04-29 17:46:32 GMT)
--------------------------------------------------

"Dalle béton sur plancher bois ? - BricoZone
http://www.bricozone.be/.../t-dalle-beton-sur-plancher-bois-... this page
Mar 10, 2009 – ensuite, tu enlèves le plancher existant en bois, je suppose? ... les solives font 13x13 cm et il y en a 3 par mètre. .."
Peer comment(s):

agree Tony M : Ah yes, now putting it that way, that DOES make sense: braced TO rather than AT.
27 mins
Standard practice is 3 joists per meter (been there, done that) - the bracing, usually in the middle, ensures that the distance remains the same all along the joist
agree Hervé Michaud
8 hrs
merci!
agree Proelec
14 hrs
merci !
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Merci beaucoup!"
+1
25 mins

espacement des solives 1'-0"

une suggestion...

o/c off center
Peer comment(s):

agree GILLES MEUNIER : ou écartement des solives
16 mins
merci
neutral Tony M : o/c = OVER centres, as Asker has said. But this seems to miss out the 'bracing' element.
19 mins
Something went wrong...
13 hrs

pose de contreventements à 1'-0"

Une proposition
Something went wrong...