Aug 11, 2004 12:48
20 yrs ago
7 viewers *
German term
Nachlauf
German to English
Tech/Engineering
Computers: Software
camera software
"Herunterfahren kann während der Nachlaufzeit mit dem Melder abgebrochen werden"
(Melder is sensor)
I also have some doubts as to the meaning of the whole sentence
"Herunterfahren kann während der Nachlaufzeit mit dem Melder abgebrochen werden"
(Melder is sensor)
I also have some doubts as to the meaning of the whole sentence
Proposed translations
(English)
3 | /delay/after-running/ | Robert Tucker (X) |
4 | running time | Derek Gill Franßen |
3 | maybe something like this | Bhupali Gupte (X) |
Proposed translations
1 hr
Selected
/delay/after-running/
Nachlaufzeit=delay period=after-running period
webcoordinator.de/englisch/dn.h
Not quite sure of your context. Is it to do with a security camera that detects sound or motion and continues to operate for a while after having detected something? Or is it to do with running the camera (before and) after recoding a scene? Or yet another context?
--------------------------------------------------
Note added at 2004-08-11 13:52:40 (GMT)
--------------------------------------------------
... after recording ...
--------------------------------------------------
Note added at 2004-08-11 18:28:18 (GMT)
--------------------------------------------------
The camera image (is recorded periodically and) is recorded for so long after the sensor has detected something (noise or movement) even if the sensor does not detect anything further during that period. But if the sensor does detect something further the shutdown of the recording after the defined period is not effected ???
Shutdown can be overridden by the sensor during the triggered runtime ???
webcoordinator.de/englisch/dn.h
Not quite sure of your context. Is it to do with a security camera that detects sound or motion and continues to operate for a while after having detected something? Or is it to do with running the camera (before and) after recoding a scene? Or yet another context?
--------------------------------------------------
Note added at 2004-08-11 13:52:40 (GMT)
--------------------------------------------------
... after recording ...
--------------------------------------------------
Note added at 2004-08-11 18:28:18 (GMT)
--------------------------------------------------
The camera image (is recorded periodically and) is recorded for so long after the sensor has detected something (noise or movement) even if the sensor does not detect anything further during that period. But if the sensor does detect something further the shutdown of the recording after the defined period is not effected ???
Shutdown can be overridden by the sensor during the triggered runtime ???
4 KudoZ points awarded for this answer.
Comment: "thanks a lot"
5 mins
running time
http://www.proz.com/?sp=h&id=541296
--------------------------------------------------
Note added at 48 mins (2004-08-11 13:37:23 GMT)
--------------------------------------------------
I understand your plight. This probably means the shutdown (sequence) can be interrupted by the sensor in/during the time after telling it to shut down and it actually being off.
some possibilities could be: \"shutdown time\" or maybe even \"post-run(ning) time\". Though it probably relates to the period of time after the nuclear power plant (in this case) is shut down, I\'ve even seen \"post shutdown time period\" here:
\"PDF] LOW ACTIVATION MATERIAL CANDIDATES FOR FUSION POWER PLANTS
Dateiformat: PDF/Adobe Acrobat - HTML-Version
... considered in detail, since each response function has some key S&E relevance which
becomes important at different stages during the post shutdown time period. ...
www.fusion.org.uk/techdocs/euromat.pdf - Ähnliche Seiten \"
:-)
--------------------------------------------------
Note added at 48 mins (2004-08-11 13:37:23 GMT)
--------------------------------------------------
I understand your plight. This probably means the shutdown (sequence) can be interrupted by the sensor in/during the time after telling it to shut down and it actually being off.
some possibilities could be: \"shutdown time\" or maybe even \"post-run(ning) time\". Though it probably relates to the period of time after the nuclear power plant (in this case) is shut down, I\'ve even seen \"post shutdown time period\" here:
\"PDF] LOW ACTIVATION MATERIAL CANDIDATES FOR FUSION POWER PLANTS
Dateiformat: PDF/Adobe Acrobat - HTML-Version
... considered in detail, since each response function has some key S&E relevance which
becomes important at different stages during the post shutdown time period. ...
www.fusion.org.uk/techdocs/euromat.pdf - Ähnliche Seiten \"
:-)
1 hr
maybe something like this
The shutdown process/sequence can be aborted with the sensor from the time of initiation (maybe a better verb) until the actual shutdown.
Just an idea
Just an idea
Discussion