German to English translations [PRO] Architecture | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Ker United Kingdom Local time: 20:07 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
3 +2 | below grade |
| ||
4 | ground level |
| ||
4 | below ground |
|
Discussion entries: 1 | |
---|---|
ground level Explanation: :-) |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
below grade Explanation: below ground level Assume an 8-ft. basement is to be built on a slope so that the front wall is 7 ft. below grade and the rear wall is totally above grade. The ground level along both side walls is sloped so that approximately 50% of each wall is *below grade*. The rear basement wall will be wood-frame construction with R-19 cavity insulation. The other three walls will be concrete walls with R-10 rigid insulation. All four walls will be fully insulated. http://energycode.pnl.gov/html/ResourceCenter/106.html |
| ||||||||||
26 mins confidence:
Login or register (free and only takes a few minutes) to participate in this question. You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy. KudoZ™ translation helpThe KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.
See also: Search millions of term translations Your current localization setting
English
Select a language Close search
|