Nov 7, 2008 07:12
16 yrs ago
2 viewers *
Dutch term
aangeheeld
Dutch to English
Tech/Engineering
Construction / Civil Engineering
road construction
From term
"aangestort/aangeheeld/gestraald"
From sentence
"Na het slopen dient de bestaande constructie eventueel te worden aangestort/aangeheeld/gestraald, zodat de innovatieve voegovergangen kunnen worden ingebouwd."
contained in a road joint construction spec. doc.
"aangestort/aangeheeld/gestraald"
From sentence
"Na het slopen dient de bestaande constructie eventueel te worden aangestort/aangeheeld/gestraald, zodat de innovatieve voegovergangen kunnen worden ingebouwd."
contained in a road joint construction spec. doc.
Proposed translations
(English)
4 +1 | (final) smoothing | Jack den Haan |
4 | make good | Marijke Singer |
References
previous search | Lianne van de Ven |
Proposed translations
+1
1 hr
Selected
(final) smoothing
Tip: google 'final smoothing' in combination with 'road', or 'road construction' in combination with 'smoothing'.
4 KudoZ points awarded for this answer.
Comment: "Thank you for your assistance and sorry about the long wait with the question. I have just translated the updates and now I have technical description details and diagram and this is the answer which fits here. Thanks again."
1 day 1 hr
make good
See the following websites:
http://www.dlrcoco.ie/planning/Part8/Booterstown.htm
"The site is predominately covered with clause 804 already. Make good the surface to ensure no dirt exits the site."
http://www.devon.gov.uk/highwaysdesignguidepart4.pdf
"If the Developer allows the moisture content of accepted compacted material to reach a value above the maximum permitted for the material for compaction the Developer shall allow the material to revert to
an acceptable moisture content and if directed by the Engineer,
make good the surface by re-compaction before laying the subbase
in accordance with 6.7.1(i) to (iv) inclusive."
http://www.dlrcoco.ie/planning/Part8/Booterstown.htm
"The site is predominately covered with clause 804 already. Make good the surface to ensure no dirt exits the site."
http://www.devon.gov.uk/highwaysdesignguidepart4.pdf
"If the Developer allows the moisture content of accepted compacted material to reach a value above the maximum permitted for the material for compaction the Developer shall allow the material to revert to
an acceptable moisture content and if directed by the Engineer,
make good the surface by re-compaction before laying the subbase
in accordance with 6.7.1(i) to (iv) inclusive."
Reference comments
4 hrs
Discussion
Lianne thanks - I didn't find that reference so that was helpful, but it does seem a little different in this case as the "aangestort/aangeheeld/gestraald" seem all to be types of preparation works which prepare (the ends?) existing structure to allow the new experimental structure to be built in. Unless of course the new joint is of different dimensions than the previous one ....