Oct 16, 2020 17:28
3 yrs ago
16 viewers *
English term
Pre-commissioning Operational Overview
English to Russian
Tech/Engineering
Petroleum Eng/Sci
Pre-commissioning Operational Overview
The “dry” pre-commissioning of the NSP2 pipeline B will be performed using cleaning and gauging pigs and calliper inspection pigs propelled from the temporary pig launcher at Landfall Germany (LFG) to the temporary pig receiver at Landfall Russia (LFR). The pig train will consist of a total of 6 pigs; comprising of quantity (qty) 3x Bi-Di (bi-directional) cleaning and gauging pigs, 2x calliper inspection pigs and a final qty 1x Bi-Di cleaning and gauging pig.
The “dry” pre-commissioning of the NSP2 pipeline B will be performed using cleaning and gauging pigs and calliper inspection pigs propelled from the temporary pig launcher at Landfall Germany (LFG) to the temporary pig receiver at Landfall Russia (LFR). The pig train will consist of a total of 6 pigs; comprising of quantity (qty) 3x Bi-Di (bi-directional) cleaning and gauging pigs, 2x calliper inspection pigs and a final qty 1x Bi-Di cleaning and gauging pig.
Proposed translations
(Russian)
3 | оперативный обзор пусконаладочных работ | Mikhail Zavidin |
4 | обзор состава пусконаладочных работ | Pavel Altukhov |
3 | оперативный обзор перед вводом в эксплуатацию | Lesia Kutsenko |
Proposed translations
16 mins
Selected
оперативный обзор пусконаладочных работ
+
4 KudoZ points awarded for this answer.
9 mins
обзор состава пусконаладочных работ
n/a
11 mins
оперативный обзор перед вводом в эксплуатацию
или перед приемкой в эксплуатацию
Something went wrong...